VOOZH about

URL: https://mcp.so/tag/Primavera-P6

⇱ #Primavera-P6 MCP Server


#Primavera-P6

1 results found

C

Critical Path Partners forensic scheduling MCP

13 tools for Primavera P6 forensic delay analysis — AACE windows (29R-03 MIP 3.3), DCMA-14 health checks, Monte Carlo SRA with AACE 122R-22 QRAMM maturity, TIA fragnet (MIP 3.7), collapsed as-built (MIP 3.8), and claim workbench evidence ledger. Open-source CPM engine (MIT) at github.com/danafitkowski/cpp-cpm-engine. Daubert-disclosed methodology. 66-jurisdiction holiday calendars. SHA-256 topology hash on every output. Live hosted at https://mcp.criticalpathpartners.ca/mcp (Streamable HTTP transport).

© 2025 MCP.so. All rights reserved.

Build with ShipAny.