gurucomkz/silverstripe-critical-path-css
Critical Path CSS compiler/cacher for SilverStripe
Maintainers
Package info
github.com/gurucomkz/silverstripe-critical-path-css
Type:silverstripe-vendormodule
pkg:composer/gurucomkz/silverstripe-critical-path-css
Requires
Requires (Dev)
None
Suggests
None
Provides
None
Conflicts
None
Replaces
None
BSD-3-Clause 3c13b5dc6b49e5d795918b8a6b941fda36bffa23
This package is auto-updated.
Last update: 2026-06-19 06:04:26 UTC
README
Assists in producing the Critical path CSS for every page of the website, including that code and postponing every other css. Uses penthouse to generate the CSS.
How it works
The module provides a dev task GenerateCriticalPathCSS that calls every Live page on the website,
and processes the HTML with penthouse, caches the resulting CSS,
injects the latter into pages' during regular requests HTML and postpones all the already inlcluded local(!) CSS files using
a special javascript snippet.
If you choose to involve external CSS files (see Configuration below) they will be downloaded and stored in cache.
Limitations
- All the CSS files you want to involve must be included using
Requirements::css()orRequirements::themedCSS(). - Firefox doesn't seem to like the postponing of CSS files and will most likely not gain any real speed boost.
Requirements
nodejsyarnornpm
They are required to install penthouse after package installation.
Installation
Install via composer and do ?flush=1.
composer require --prefer-dist gurucomkz/silverstripe-critical-path-css "dev-master"
Install required packages inside the package's directory with yarn or npm.
cd vendor/gurucomkz/silverstripe-critical-path-css yarn || npm
Usage
This is intended to be run on the target server.
sake dev/tasks/GenerateCriticalPathCSS
This task may take a lot of time depending on amount of pages on the website and effort required to produce their HTML. Please, note that since this command is executed in CLI caches produced by your web server are not applicable.
Configuration
Gurucomkz\Critpath: # involve the external css files include_external: true # default: false # ensure these selectors are a part of the critical path CSS # see https://github.com/pocketjoso/penthouse#options for 'forceInclude' force_css_selectors: - ".abc" - "#another" - "/\\.slick.*/"
TODO
- Unit tests
Contributing
Please create an issue or a PR for any bugs you've found, or features you're missing.
