How To
Summary
Learn about the IBM Power Systems in particular the Power10 server range presented as Infographics.
Objective
👁 Nigels Banner
Environment
If you need more information, then read the IBM Redbooks and Announcement Letters on these Servers:
Redbooks:
- Scale-out S1022 & S1024 from IBM Redbooks
- Midrange E1050 from IBM Redbooks
- High End E1080 from IBM Redbooks
Latest Power performance numbers:
- IBM Power Performance Report, POWER7 to Power10, 12 July 2022
- https://www.ibm.com/downloads/cas/K90RQOW8 (.pdf)
Announcements:
- Scale-out S1024 from IBM Announcements
- Scale-out S1022 from IBM Announcements
- Scale-out S1014 from IBM Announcements
- Scale-out S1022s from IBM Announcements
- Scale-out L1024 from IBM Announcements
- Scale-out L1022 from IBM Announcements
- Midrange E1050 from IBM Announcements
- High End E1080 from IBM Announcements
New (July 2022) YouTube videos on Power10 servers from the author:
👁 image-20220725122711-1
- Power10 Enterprise E1050 - up to 96 CPU cores and 16 TB memory
- https://youtu.be/fH8lSRljRzU
- Power10 Scale-out E1024 with many pictures externals and internal and parts removed
- https://youtu.be/A6R-NHnojrw
- Power10 Scale-out E1024 with live hand-held video
- https://youtu.be/K61xm3k-X88
Download the Power Infographics PowerPoint presentation:
- These slides are the author's opinion and not IBM statements. All errors are mine.
- Check all details in the Redbooks, which are more carefully proofread and edited by a larger team.
- Send feedback, corrections, and questions to my email at the end of this article.
- You are welcome to use the slides and replace my name with yours.
- Hopefully, you are saying positive things about these amazing new Power10 servers.
- Update August 2022: Oracle confirmed that RDBMS Standard Edition 2 cannot be used on the S1022s.
- 5 September2022. PowerPoint file. Check back here for updates.
- This version has a changed date for the Scale-out and E1050 larger OMI memory cards to 9 December 2022.
- POWER10_Info_Graphic_v22.pptx
A YouTube video of these Infographic slides is available with my commentary:
- 👁 image-20220822103811-2
- Link to YouTube https://youtu.be/z7vAPROx8RQ
- 32 minutes long and briefly covers each subsection.
- The video is based on an older version of the slides from July 2022.
Steps
Power10 Scale-Out models come with Six Options
Power10 S1022 and L1022
The End
Additional Information
Other content from Nigel GriffGriffiths (retired)
Document Location
Worldwide
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SWG10","label":"AIX"},"Component":"","Platform":[{"code":"PF002","label":"AIX"}],"Version":"All Versions","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"HW1W1","label":"Power -\u003EPowerLinux"},"Component":"","Platform":[{"code":"PF016","label":"Linux"}],"Version":"All Versions","Edition":"","Line of Business":{"code":"","label":""}},{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SWG60","label":"IBM i"},"Component":"","Platform":[{"code":"PF012","label":"IBM i"}],"Version":"All Versions","Edition":"","Line of Business":{"code":"LOB57","label":"Power"}}]
Was this topic helpful?
Document Information
Modified date:
08 June 2023
UID
ibm16602597
