State Route 82 | |||
|---|---|---|---|
Route of SR 82 highlighted in red | |||
| Route information | |||
| Maintained by ODOT | |||
| Length | 88.57 mi[1] (142.54 km) | ||
| Existed | 1924βpresent | ||
| Major junctions | |||
| West end | π Image SR 57 near Elyria | ||
| Major intersections |
| ||
| East end | π Image π Image US 62 / CR 331 in Masury | ||
| Location | |||
| Country | United States | ||
| State | Ohio | ||
| Counties | Lorain, Cuyahoga, Summit, Portage, Trumbull | ||
| Highway system | |||
| |||
| |||
State Route 82 (SR 82) is a state route in northeastern Ohio, with a western terminus at State Route 57 in Lorain County, southeast of Elyria.
Route description
[edit]The route travels predominantly eastward through the southern suburbs of Cleveland as it traverses part of Lorain County, the southern tier of Cuyahoga County, the northern tier of Summit County, and enters Portage County. This segment of State Route 82 is very heavily traveled, and intersects with four interstate highways. Six-ramp interchanges join the route with Interstate 71 and Interstate 77, a partial interchange joins 82 with Interstate 271, and a diamond interchange intersects with Interstate 480/State Route 14. The route also passes through the Cuyahoga Valley National Park in Brecksville, where it crosses the Cuyahoga River on the Brecksville-Northfield High Level Bridge.
After passing through the northern tier of Portage County, State Route 82 crosses central Trumbull County, becoming a freeway for ten miles (16 km) along with State Route 5 as it bypasses the city of Warren. East of Warren, the route continues as a 4-lane divided highway, with level intersections at most secondary roads and interchanges with most other state highways, including a modified cloverleaf interchange with State Route 11. Just before the Pennsylvania state line, State Route 82 meets its eastern terminus with a full cloverleaf interchange in Masury at U.S. Route 62 and Trumbull CR 331 (Hubbard-Masury Road), which continues south.
History
[edit]The former alignment of State Route 82 in Trumbull followed Market Street through Warren (concurrent with State Route 5 to Elm Road), and then continued east on what is now Warren-Sharon Road through Howland, Vienna, and Brookfield Center. The former eastern terminus of the route was where Warren-Sharon Road meets the Pennsylvania state line, and State Street in Sharon, Pennsylvania continues east.
In 2012, three men were sentenced to prison for a plot to blow up the Route 82 bridge in Cuyahoga Valley National Park.[2]
Major intersections
[edit]| County | Location | mi[1] | km | Destinations | Notes |
|---|---|---|---|---|---|
| Lorain | Carlisle Township | 0.00 | 0.00 | π Image SR 57 (Grafton Road) β Grafton, Elyria | |
| Eaton Township | 2.57 | 4.14 | π Image SR 83 (Avon-Belden Road) β Belden, North Ridgeville | ||
| Columbia Township | 8.08 | 13.00 | π Image SR 252 (East River Road) β Mallet Creek | ||
| Cuyahoga | Strongsville | 11.09 | 17.85 | π Image π Image SR 237 north (Prospect Road) | Southern terminus of SR 237 |
| 12.28 | 19.76 | π Image US 42 (Pearl Road) | |||
| 13.44β 13.73 | 21.63β 22.10 | π Image I-71 β Columbus, Cleveland | Exit 231 (I-71) | ||
| North Royalton | 17.63 | 28.37 | π Image SR 3 (Ridge Road) | ||
| 18.16 | 29.23 | π Image SR 94 (State Road) | |||
| Broadview Heights | 20.23 | 32.56 | π Image SR 176 (Broadview Road) | ||
| 21.98β 22.33 | 35.37β 35.94 | π Image I-77 β Akron, Cleveland | Exit 149 (I-77) | ||
| Brecksville | 23.37 | 37.61 | π Image SR 21 (Brecksville Road) | ||
| Summit | Macedonia | 29.07 | 46.78 | π Image π Image π Image π Image SR 8 to I-271 south | |
| 29.55β 29.63 | 47.56β 47.68 | π Image π Image π Image π Image I-271 north to I-90 β Erie, PA | Exit 19 (I-271); northbound I-271 entrance / southbound I-271 exit only | ||
| Twinsburg | 32.76β 32.89 | 52.72β 52.93 | π Image π Image I-480 / SR 14 β Youngstown, Cleveland | Exit 36 (I-480) | |
| 33.41 | 53.77 | π Image SR 91 (Darrow Road) β Solon, Hudson | |||
| Portage | Aurora | 38.52 | 61.99 | π Image SR 43 (Aurora Road) | |
| 38.76 | 62.38 | π Image SR 306 (Chillicothe Road) β Mentor, Streetsboro | |||
| Mantua Township | 45.41 | 73.08 | π Image π Image π Image π Image π Image SR 44 (PainesvilleβRavenna Road) to Ohio Turnpike / I-80 β Chardon, Mantua | ||
| Hiram | 49.48 | 79.63 | π Image π Image π Image π Image SR 700 north (Garfield Road) / SR 305 east (Wakefield Road) β Burton | Western end of SR 700 concurrency; eastern terminus of SR 305 | |
| Hiram Township | 50.20 | 80.79 | π Image π Image SR 700 south (Garfield Road) | Eastern end of SR 700 concurrency | |
| Garrettsville | 52.83 | 85.02 | π Image SR 88 (North Street / South Street) | ||
| Trumbull | Braceville Township | 60.11 | 96.74 | π Image π Image SR 303 west (HudsonβBraceville Road) β Windham | Eastern terminus of SR 303 |
| 60.31 | 97.06 | π Image SR 534 β West Farmington, Newton Falls | |||
| 63.99 | 102.98 | π Image π Image π Image π Image SR 5 west to Ohio Turnpike β Ravenna | Western end of SR 5 concurrency | ||
| Warren Township | Western end of freeway | ||||
| 65.60β 65.74 | 105.57β 105.80 | West Market Street / Homeview Avenue β Warren | |||
| 67.00β 67.39 | 107.83β 108.45 | π Image US 422 (Parkman Road) β Cleveland | |||
| Champion Township | 69.20β 69.54 | 111.37β 111.91 | π Image SR 45 (Mahoning Avenue) β Ashtabula | ||
| Bazetta Township | 71.31β 71.64 | 114.76β 115.29 | Perkins-Jones Road / Larchmont Avenue Extension | ||
| 72.62β 72.90 | 116.87β 117.32 | π Image π Image SR 5 east (Elm Road) β Cortland | Eastern end of SR 5 concurrency | ||
| Howland Township | 75.15β 76.14 | 120.94β 122.54 | East Market Street β Warren | ||
| 76.68β 76.97 | 123.40β 123.87 | π Image SR 46 (NilesβCortland Road Southeast) β Cortland, Niles | This interchange is being reconstructed to a diverging diamond interchange. Construction began in Summer 2023 and is projected to be finished in Fall 2026. | ||
| Eastern end of freeway | |||||
| Vienna Township | 78.11β 78.75 | 125.71β 126.74 | π Image π Image π Image SR 11 to I-80 β Youngstown, Ashtabula | Exit 51 (SR 11) | |
| 80.71β 81.00 | 129.89β 130.36 | π Image SR 193 (YoungstownβKingsville Road Southeast) β Youngstown, Youngstown-Warren Regional Airport | Interchange | ||
| Brookfield Township | 85.84 | 138.15 | π Image SR 7 (HaddonβBrookfield Road) β Yankee Lake, Conneaut, Hubbard | ||
| 88.16β 88.57 | 141.88β 142.54 | π Image π Image US 62 / CR 331 (Hubbard-Masury Road) β Hubbard, Sharon, PA | Interchange | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||
References
[edit]- Articles with short description
- Short description matches Wikidata
- Use American English from April 2025
- All Wikipedia articles written in American English
- Use mdy dates from January 2025
- Infobox road instances in Ohio
- Pages using gadget WikiMiniAtlas
- Articles using KML from Wikidata
- Pages using the Kartographer extension
