VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-cloud-infragistics-reveal.rst

⇱ Analyze Microsoft Project Data in Infragistics Reveal


Analyze Microsoft Project Data in Infragistics Reveal

πŸ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Use CData Connect AI to create on OData API on top of Microsoft Project data and visualize live Microsoft Project data in Infragistics Reveal.

Reveal, an offering from Infragistics, serves as a data visualization tool that seamlessly integrates with CData Connect AI. Together, they empower users to deliver dynamic dashboards using real-time data from a diverse range of data sources, including Microsoft Project data. In this article, we will guide you through the process of connecting to Microsoft Project via Connect AI and subsequently linking Connect AI with Infragistics Reveal to construct a straightforward dashboard.

Connect to Microsoft Project from Infragistics Reveal

To work with live Microsoft Project data in Infragistics Reveal, we need to connect to Microsoft Project from Connect AI, provide user access to the connection, and create a Workspace for the Microsoft Project data.

Connect to Microsoft Project from Connect AI

CData Connect AI uses a straightforward, point-and-click interface to connect to data sources.

  1. Log into Connect AI, click Sources, and then click Add Connection
  2. πŸ‘ Adding a Connection
  3. Select "Microsoft Project" from the Add Connection panel
  4. πŸ‘ Selecting a data source
  5. Enter the necessary authentication properties to connect to Microsoft Project.

    The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

    πŸ‘ Configuring a connection (Salesforce is shown)
  6. Click Save & Test
  7. Navigate to the Permissions tab in the Add Microsoft Project Connection page and update the User-based permissions. πŸ‘ Updating permissions

Add a Personal Access Token

When connecting to Connect AI through the REST API, the OData API, or the Virtual SQL Server, a Personal Access Token (PAT) is used to authenticate the connection to Connect AI. It is best practice to create a separate PAT for each service to maintain granularity of access.

  1. Click on the Gear icon () at the top right of the Connect AI app to open the settings page.
  2. On the Settings page, go to the Access Tokens section and click Create PAT.
  3. Give the PAT a name and click Create. πŸ‘ Creating a new PAT
  4. The personal access token is only visible at creation, so be sure to copy it and store it securely for future use.

Configure Microsoft Project Endpoints for Infragistics Reveal

After connecting to Microsoft Project, create a workspace for your desired table(s).

  1. Navigate to the Workspaces page and click Add to create a new Workspace (or select an existing workspace). πŸ‘ The Workspaces page.
    πŸ‘ Adding a new Workspace.
  2. Click Add to add new assets to the Workspace.
  3. Select the Microsoft Project connection (e.g. MicrosoftProject1) and click Next. πŸ‘ Selecting an Asset (Salesforce is shown).
  4. Select the table(s) you wish to work with and click Confirm. πŸ‘ Selecting Tables (Salesforce is shown).
  5. Make note of the OData Service URL for your workspace, e.g. https://cloud.cdata.com/api/odata/{workspace_name}

With the connection, PAT, and Workspace configured, you are ready to connect to Microsoft Project data from Infragistics Reveal.

Create a Dashboard in Reveal

With Connect AI configured, we can visualize Microsoft Project data in Reveal.

  1. Log into Reveal and click Dashboards -> New πŸ‘ Adding a new dashboard
  2. Click Data Sources -> OData Feed πŸ‘ Adding a new OData data source
  3. Specify the Connect AI OData API endpoint URL (found on the OData page): https://cloud.cdata.com/api/odata/{workspace_name} πŸ‘ Configuring the OData URL
  4. Select Generic Credentials and
    • Set Username to a Connect AI username (e.g. [email protected])
    • Set Password to the PAT for the user
    πŸ‘ Configuring the credentials
  5. Select the entity you wish to visualize πŸ‘ Selecting an entity to visualize (Salesforce is shown.)
  6. Select fields and choose a chart type πŸ‘ Visualizing data in Reveal (Salesforce is shown.)

More Information & Free Trial

At this point, you have created a simple dashboard from live Microsoft Project data. For more information on creating OData feeds from Microsoft Project (and more than 100 other sources), visit the Connect AI page. Sign up for a free trial and start working live Microsoft Project data in tools that consume OData APIs.