Mendix is a high-productivity app platform that allows you to build and maintain both mobile and web applications at-scale. When paired with CData Connect AI, Mendix provides instant, cloud-to-cloud access to Microsoft Project data for applications. This article demonstrates how to connect to a CData Connect AI data source from within Mendix.
CData Connect AI provides a pure cloud-to-cloud interface for Microsoft Project, allowing you to import data from live Microsoft Project data in Mendix β without replicating the data to a natively supported database. As you build web and mobile applications from within Mendix, CData Connect AI pushes all supported SQL operations (filters, JOINs, etc.) directly to Microsoft Project, leveraging server-side processing to return the requested Microsoft Project data quickly.
Configure Microsoft Project Connectivity for Mendix
To work with Microsoft Project data from Mendix, we need to connect to Microsoft Project from Connect AI, provide user access to
the connection, and create a Workspace for the Microsoft Project data.
Connect to Microsoft Project from Connect AI
CData Connect AI uses a straightforward, point-and-click interface to connect to data sources.
-
Log into Connect AI, click Sources, and then click Add Connection
π Adding a Connection
- Select "Microsoft Project" from the Add Connection panel
π Selecting a data source
-
Enter the necessary authentication properties to connect to Microsoft Project.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user
credentials. In addition, specify a URL to a valid Microsoft Project server organization root or
Microsoft Project services file.
π Configuring a connection (Salesforce is shown)
-
Click Save & Test
-
Navigate to the Permissions tab in the Add Microsoft Project Connection page and update the User-based permissions.
π Updating permissions
Add a Personal Access Token
When connecting to Connect AI through the REST API, the OData API, or the Virtual SQL Server, a Personal Access Token (PAT) is used to authenticate the connection to Connect AI. It is best practice to create a separate PAT for each service to maintain granularity of access.
-
Click on the Gear icon () at the top right of the Connect AI app to open the settings page.
-
On the Settings page, go to the Access Tokens section and click Create PAT.
-
Give the PAT a name and click Create.
π Creating a new PAT
-
The personal access token is only visible at creation, so be sure to copy it and store it securely for future use.
Configure Microsoft Project Endpoints for Mendix
After connecting to Microsoft Project, create a workspace for your desired table(s).
-
Navigate to the Workspaces page and click Add to create a new Workspace (or select an existing workspace).
π The Workspaces page.
π Adding a new Workspace.
-
Click Add to add new assets to the Workspace.
-
Select the Microsoft Project connection (e.g. MicrosoftProject1) and click Next.
π Selecting an Asset (Salesforce is shown).
-
Select the table(s) you wish to work with and click Confirm.
π Selecting Tables (Salesforce is shown).
-
Make note of the OData Service URL for your workspace, e.g. https://cloud.cdata.com/api/odata/{workspace_name}
With the connection, PAT, and Workspace configured, you are ready to connect to Microsoft Project data from Mendix.
Build a Microsoft Project-Connected App
Downloading the OData Metadata File
When creating a connection in Mendix, the connection flow requires a Data Source Contract File. Follow these steps to download the OData metadata file for CData Connect AI using curl, a command line tool:
-
Open a command-line window for your operating system. On Windows, open the start menu, type cmd, and press the Enter key to open a command prompt. On macOS and Linux, open a Terminal window.
-
To check if curl is installed on your system, type curl -help and press the enter key. If it is not installed, install it from the curl website.
-
Issue the following curl command, replacing USER with your CData Connect AI username and PAT with the PAT you generated above:
curl -u USER:PAT https://cloud.cdata.com/api/odata/{workspace_name}/$metadata -o metadata.xml
-
Locate the metadata.xml file that the curl command created and move it to an accessible location.
Connecting to CData Connect AI in Mendix
Follow these steps to establish a connection from Mendix to CData Connect AI:
- Login to Mendix and open the Data Hub page.
π Mendix landing page
- In the Register a Data Source section, select OData.
π Registering an OData data source
- Upload the metadata.xml file from the steps above and click Next.
π Uploading metadata file
-
Enter your desired values for Data Source Name and Data Source Version.
In the Data Source Relative Path field, enter /api/odata/{workspace_name} and click Next.
π Creating the data source
- On the Application information page, click Register a new application.
π Register new app
-
Enter a name in Application Name and select a technical owner (by default,
this is the user who is currently logged in).
π Filling in fields for the app
-
Click Next. In the Environment Name field, enter a desired name (for example, CData Connect AI).
In the Environment Location field, enter https://cloud.cdata.com and select the appropriate
Environment Type (e.g. Production), depending on what is needed.
π Creating the environment
- Click Done! to create your connection.
π Finalizing the connection
You can now use your connection in Mendix Studio Pro to easily create applications with access to live Microsoft Project data.
Get CData Connect AI
To get live data access to hundreds of SaaS, Big Data, and NoSQL sources directly from your cloud
applications, try CData Connect AI today!