VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-apache-solr.rst

⇱ How to import Microsoft Project Data into Apache Solr


How to import Microsoft Project Data into Apache Solr

πŸ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Use the CData JDBC Driver for Microsoft Project in Data Import Handler and create an automated import of Microsoft Project data to Apache Solr Enterprise Search platform.

The Apache Solr platform is a popular, blazing-fast, open source enterprise search solution built on Apache Lucene.

Apache Solr is equipped with the Data Import Handler (DIH), which can import data from databases and, XML, CSV, and JSON files. When paired with the CData JDBC Driver for Microsoft Project, you can easily import Microsoft Project data to Apache Solr. In this article, we show step-by-step how to use CData JDBC Driver in Apache Solr Data Import Handler and import Microsoft Project data for use in enterprise search.

Create an Apache Solr Core and a Schema for Importing Microsoft Project

  1. Run Apache Solr and create a Core.
    > solr create -c CDataCore
    For this article, Solr is running as a standalone instance in the local environment and you can access the core at this URL: http://localhost:8983/solr/#/CDataCore/core-overview
  2. Create a schema consisting of "field" objects to represent the columns of the Microsoft Project data to be imported and a unique key for the entity. LastModifiedDate, if it exists in Microsoft Project, is used for incremental updates. If it does not exist, you cannot do the deltaquery in the later section. Save the schema in the managed-schema file created by Apache Solr.
  3. 	MicrosoftProjectUniqueKey
    	
    	
    	
    	
    	
    	
    	
    	 
    	
    πŸ‘ Define schema in Solr for Microsoft Project data.
  4. Install the CData Microsoft Project JDBC Driver. Copy the JAR and license file (cdata.microsoftproject.jar and cdata.jdbc.microsoftproject.lic) to the Solr directory.
    • CData JDBC JAR file: C:\Program Files\CData\CData JDBC Driver for Microsoft Project ####\lib
    • Apache Solr: solr-8.5.2\server\lib

Now we are ready to use Microsoft Project data in Solr.

Define an Import of Microsoft Project to Apache Solr

In this section, we walk through configuring the Data Import Handler.

  1. Modify the Config file of the created Core. Add the JAR file reference and add the DIH RequestHander definition.
    	
    
    	<lib dir="${solr.install.dir:../../../..}/dist/" regex="solr-dataimporthandler-.*\.jar" />
    
    	<requestHandler name="/dataimport" class="org.apache.solr.handler.dataimport.DataImportHandler">
    		<lst name="defaults">
    			<str name="config">solr-data-config.xml</str>
    		</lst>
    	</requestHandler>
  2. Next, create a solr-data-config.xml at the same level. In this article, we retrieve a table from Microsoft Project, but you can use a custom SQL query to request data as well. The Driver Class and a sample JDBC Connection string are in the sample code below.
    	
    	<dataConfig>
    		<dataSource driver="cdata.jdbc.microsoftproject.MicrosoftProjectDriver" url="jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;">
    		</dataSource> 
    		<document> 
    			<entity name="Projects" 
    				query="SELECT Id,MicrosoftProjectColumn1,MicrosoftProjectColumn2,MicrosoftProjectColumn3,MicrosoftProjectColumn4,MicrosoftProjectColumn5,MicrosoftProjectColumn6,MicrosoftProjectColumn7,LastModifiedDate FROM Projects"
    				deltaQuery="SELECT Id FROM Projects where LastModifiedDate >= '${dataimporter.last_index_time}'"
    				deltaImportQuery="SELECT Id,MicrosoftProjectColumn1,MicrosoftProjectColumn2,MicrosoftProjectColumn3,MicrosoftProjectColumn4,MicrosoftProjectColumn5,MicrosoftProjectColumn6,MicrosoftProjectColumn7,LastModifiedDate FROM Projects where Id=${dataimporter.delta.Id}">
    				<field column="Id" name="Id" ></field>
    				<field column="MicrosoftProjectColumn1" name="MicrosoftProjectColumn1" ></field>
    				<field column="MicrosoftProjectColumn2" name="MicrosoftProjectColumn2" ></field>
    				<field column="MicrosoftProjectColumn3" name="MicrosoftProjectColumn3" ></field>
    				<field column="MicrosoftProjectColumn4" name="MicrosoftProjectColumn4" ></field>
    				<field column="MicrosoftProjectColumn5" name="MicrosoftProjectColumn5" ></field>
    				<field column="MicrosoftProjectColumn6" name="MicrosoftProjectColumn6" ></field>
    				<field column="MicrosoftProjectColumn7" name="MicrosoftProjectColumn7" ></field>
    				<field column="LastModifiedDate" name="LastModifiedDate" ></field> 
    			</entity>
    		</document>
    	</dataConfig>
  3. In the query section, set the SQL query that select the data from Microsoft Project. deltaQuery and deltaImportquery define the ID and the conditions when using incremental updates from the second import of the same entity.
  4. After all settings are done, restart Solr.
    	> solr stop -all
    	> solr start
    	

Run a DataImport of Microsoft Project Data.

  1. Execute DataImport from the URL below:
    http://localhost:8983/solr/#/CDataCore/dataimport//dataimport πŸ‘ Load Microsoft Project data to Solr using Data Import.
  2. Select the "full-import" Command, choose the table from Entity, and click "Execute." πŸ‘ Execute full import in Solr.
  3. Check the result of the import from the Query. πŸ‘ Check the full import result of Microsoft Project.
  4. Try an incremental update using deltaQuery. Modify some data in the original Microsoft Project data set. Select the "delta-import" command this time from DataImport window and click "Execute." πŸ‘ Execute Delta import in Solr.
  5. Check the result of the incremental update. πŸ‘ Check the delta import result of Microsoft Project.

Using the CData JDBC Driver for Microsoft Project you are able to create an automated import of Microsoft Project data into Apache Solr. Download a free, 30 day trial of any of the hundreds of CData JDBC Drivers and get started today.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!