VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-apos-ldg.rst

⇱ Build Semantic Layer Views for Microsoft Project Data in APOS Live Data Gateway


Build Semantic Layer Views for Microsoft Project Data in APOS Live Data Gateway

πŸ‘ Dibyendu Datta
Dibyendu Datta
Lead Technology Evangelist
Use the CData Connector for Microsoft Project in APOS Live Data Gateway to build Semantic Layer Views for Microsoft Project data.

APOS Live Data Gateway (LDG) is a data connection and data transformation solution that enables live data connectivity and expanded data source options for SAP Analytics Cloud and other SAP solutions. When paired with CData Connectors, users can build semantic layer views for live Microsoft Project data, enabling real-time analytics on Microsoft Project just like working with a relational database.

With built-in optimized data processing, the CData Connector offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). Its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.

Download and Install the Connector Files

In order to access Microsoft Project data through the APOS Live Data Gateway, you will need to download the connector files from APOS and install them on the machine hosting the Live Data Gateway. An APOS representative can deliver the necessary files.

  • Install the CData DLL file (System.Data.CData.MicrosoftProject.dll) to the APOS Live Data Gateway installation directory (C:\Program Files\Live Data Gateway\Admin\ by default).
  • Install the CData JAR file (cdata.jdbc.microsoftproject.jar) to the ConnectionTest_lib folder in the installation directory (C:\Program Files\Live Data Gateway\Admin\ConnectionTest_lib\ by default).
  • Install the CData JAR file (cdata.jdbc.microsoftproject.jar) to the lib folder in the Web UI installation directory (e.g.: C:\LDG_WebUI\lib\)

Configuring the Microsoft Project Connection String

Before establishing the connection to Microsoft Project from the APOS Live Data Gateway, you need to configure the Microsoft Project JDBC Connection String.

Built-in Connection String Designer

For assistance in constructing the JDBC Connection String, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

java -jar cdata.jdbc.microsoftproject.jar

Fill in the connection properties and copy the connection string to the clipboard.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

πŸ‘ Using the built-in connection string designer to generate a JDBC URL (microsoft project is shown.)

Your connection string will look similar to the following:

jdbc:MicrosoftProject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;

Connecting to Microsoft Project & Creating a Semantic Layer View

After installing the connector files and configuring the connection string, you are ready to connect to Microsoft Project in the Live Data Gateway Admin tool and build a semantic layer view in the Live Data Gateway Web UI.

Configuring the Connection to Microsoft Project

  1. Log into your APOS Live Data Gateway Manager πŸ‘ Logging into the APOS LDG Manager
  2. If you haven't already, update your APOS LDG license file
    1. Click File -> Configurations
    2. Click on the "..." Menu for the License
    3. Select the license file from the APOS team that includes your CData Connector license
  3. In the APOS Live Data Gateway Manager, click "Add"
  4. In the APOS Live Data Gateway On the Connection tab, configure the connection:
    • Set Data Source to "Database"
    • Set Database to "CData Drivers"
    • Set Database CData Drivers to "Microsoft Project"
    • Set Connection String to the connection string configured earlier (e.g.:
      jdbc:MicrosoftProject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
    • Set Driver Class to "cdata.jdbc.microsoftproject.MicrosoftProjectDriver" (this should be set by default)
    πŸ‘ Configuring the Connection (Salesforce is shown).
  5. Click Test Connection
  6. Click Save
  7. Give your connection a unique prefix (e.g. "microsoftproject")
  8. Highlight the newly created connection and click File -> "Approve Users For Web UI" πŸ‘ Approving Users For Web UI.
  9. Approve the appropriate DB users to create views and click "Save" πŸ‘ Configuring which DB users can create views.

At this point, we are ready to build our semantic layer view in the Live Data Gateway Web UI.

Creating a Semantic Layer View

  1. In your browser, navigate to the APOS Live Data Gateway Portal
  2. Select a Connection (e.g. "microsoftproject")
  3. Set User Name and Password to the User and Password properties for Microsoft Project.
  4. Click "Login" πŸ‘ Connecting from the Web UI (Salesforce is shown).
  5. Once connected, click "Semantic Layer" to create a new semantic layer view
  6. Click "New Semantic Layer View" πŸ‘ Adding a new semantic layer view.
  7. Set the Semantic Layer View Prefix and Semantic Layer View Name πŸ‘ Setting the semantic layer view prefix and name.
  8. Click "Step 2"
  9. Select the table(s) and column(s) you wish to include in your view πŸ‘ Selecting table(s) and column(s).
  10. Click "Step 3"
  11. Select the Measures from the available table columns πŸ‘ Selecting the measure(s).
  12. Click "Step 5" (we skipped the "Extra Dimensions" step)
  13. Add any Variable Prompts
  14. Click "Step 6"
  15. Define any Table Joins
  16. Click "Review"
  17. Review you semantic layer view and click "Save" πŸ‘ Saving the semantic layer view.

With the Semantic Layer View created, you are ready to access your Microsoft Project data through the APOS Live Data Gateway, enabling real-time data connectivity to Microsoft Project data from SAP Analytics Cloud and other SAP solutions.

More Information & Free Evaluation

Please visit APOS Systems - APOS Solutions - Request Evaluation Software to request evaluation software or email [email protected] for more information on working with your live Microsoft Project data in APOS Live Data Gateway.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!