VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-aws-databricks.rst

โ‡ฑ Process & Analyze Microsoft Project Data in Databricks (AWS)


Process & Analyze Microsoft Project Data in Databricks (AWS)

๐Ÿ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Use CData, AWS, and Databricks to perform data engineering and data science on live Microsoft Project Data.

Databricks is a cloud-based service that provides data processing capabilities through Apache Spark. When paired with the CData JDBC Driver, customers can use Databricks to perform data engineering and data science on live Microsoft Project data. This article explains how to host the CData JDBC Driver in AWS, as well as connect to and process live Microsoft Project data in Databricks.

With built-in optimized data processing, the CData JDBC Driver offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). Its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.

Install the CData JDBC Driver in Databricks

To work with live Microsoft Project data in Databricks, install the driver on your Databricks cluster.

  1. Navigate to your Databricks administration screen and select the target cluster.
  2. On the Libraries tab, click "Install New."
  3. Select "Upload" as the Library Source and "Jar" as the Library Type.
  4. Upload the JDBC JAR file (cdata.jdbc.microsoftproject.jar) from the installation location (typically C:\Program Files\CData[product_name]\lib).
๐Ÿ‘ Loading the JDBC JAR File into AWS

Access Microsoft Project Data in your Notebook: Python

With the JAR file installed, we are ready to work with live Microsoft Project data in Databricks. Start by creating a new notebook in your workspace. Name the notebook, select Python as the language (though Scala is available as well), and choose the cluster where you installed the JDBC driver. When the notebook launches, we can configure the connection, query Microsoft Project, and create a basic report.

Configure the Connection to Microsoft Project

Connect to Microsoft Project by referencing the JDBC Driver class and constructing a connection string to use in the JDBC URL. Additionally, you will need to set the property in the JDBC URL (unless you are using a Beta driver). You can view the licensing file included in the installation for information on how to set this property.

Step 1: Connection Information

driver = "cdata.jdbc.microsoftproject.MicrosoftProjectDriver"
url = "jdbc:microsoftproject:RTK=5246...;User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;"

Built-in Connection String Designer

For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

java -jar cdata.jdbc.microsoftproject.jar

Fill in the connection properties and copy the connection string to the clipboard.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

๐Ÿ‘ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

Load Microsoft Project Data

Once you configure the connection, you can load Microsoft Project data as a dataframe using the CData JDBC Driver and the connection information.

Step 2: Reading the data

remote_table = spark.read.format ( "jdbc" ) \
	.option ( "driver" , driver) \
	.option ( "url" , url) \
	.option ( "dbtable" , "Projects") \
	.load ()

Display Microsoft Project Data

Check the loaded Microsoft Project data by calling the display function.

Step 3: Checking the result

display (remote_table.select ("ProjectName"))
๐Ÿ‘ Displaying Microsoft Project Data

Analyze Microsoft Project Data in Databricks

If you want to process data with Databricks SparkSQL, register the loaded data as a Temp View.

Step 4: Create a view or table

remote_table.createOrReplaceTempView ( "SAMPLE_VIEW" )

With the Temp View created, you can use SparkSQL to retrieve the Microsoft Project data for reporting, visualization, and analysis.

% sql

SELECT ProjectName, ProjectActualCost FROM SAMPLE_VIEW ORDER BY ProjectActualCost DESC LIMIT 5
๐Ÿ‘ Displaying Microsoft Project Data

The data from Microsoft Project is only available in the target notebook. If you want to use it with other users, save it as a table.

remote_table.write.format ( "parquet" ) .saveAsTable ( "SAMPLE_TABLE" )

Download a free, 30-day trial of the CData JDBC Driver for MS Project and start working with your live Microsoft Project data in Databricks. Reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

๐Ÿ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!