![]() |
VOOZH | about |
Databricks is a cloud-based service that provides data processing capabilities through Apache Spark. When paired with the CData JDBC Driver, customers can use Databricks to perform data engineering and data science on live Microsoft Project data. This article explains how to host the CData JDBC Driver in Azure, as well as connect to and process live Microsoft Project data in Databricks.
With built-in optimized data processing, the CData JDBC driver offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). Its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.
To work with live Microsoft Project data in Databricks, install the driver through Azure Data Lake Storage (ADLS). (Please note that the method of connecting through DBFS, which previous versions of this article described, has been deprecated, but has not published an end-of-life.)
https://databrickslibraries.blob.core.windows.net/jdbcjars/cdata.jdbc.salesforce.jarπ Get JAR URL
abfss://[email protected]/cdata.jdbc.salesforce.jarπ Install ADLS Library
With the JAR file installed, we are ready to work with live Microsoft Project data in Databricks. Start by creating a new notebook in your workspace. Name the workbook, make sure Python is selected as the language (which should be by default), click on Connect and under General Compute select the cluster where you installed the JDBC driver (should be selected by default).
π Attaching to an existing compute resourceConnect to Microsoft Project by referencing the class for the JDBC Driver and constructing a connection string to use in the JDBC URL. Additionally, you will need to set the property in the JDBC URL (unless you are using a Beta driver). You can view the licensing file included in the installation for information on how to set this property.
driver = "cdata.jdbc.microsoftproject.MicrosoftProjectDriver" url = "jdbc:microsoftproject:RTK=5246...;User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;"
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the JAR file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
π Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)Once the connection is configured, you can load Microsoft Project data as a dataframe using the CData JDBC Driver and the connection information.
remote_table = spark.read.format ( "jdbc" ) \ .option ( "driver" , driver) \ .option ( "url" , url) \ .option ( "dbtable" , "Projects") \ .load ()
Check the loaded Microsoft Project data by calling the display function.
display (remote_table.select ("ProjectName"))
π Displaying Microsoft Project DataIf you want to process data with Databricks SparkSQL, register the loaded data as a Temp View.
remote_table.createOrReplaceTempView ( "SAMPLE_VIEW" )
The SparkSQL below retrieves the Microsoft Project data for analysis.
result = spark.sql("SELECT ProjectName, ProjectActualCost FROM SAMPLE_VIEW")
The data from Microsoft Project is only available in the target notebook. If you want to use it with other users, save it as a table.
remote_table.write.format ( "parquet" ) .saveAsTable ( "SAMPLE_TABLE" )π Displaying Microsoft Project Data
Download a free, 30-day trial of the CData JDBC Driver for MS Project and start working with your live Microsoft Project data in Azure Databricks. Reach out to our Support Team if you have any questions.
Download a free trial of the MS Project Driver to get started:
Download NowLearn more:
π Microsoft Project IconRapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!