Connect to Microsoft Project Data in CloverDX (formerly CloverETL)

👁 Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Transfer Microsoft Project data using the visual workflow in the CloverDX data integration tool.

The CData JDBC Driver for Microsoft Project enables you to use the data transformation components in CloverDX (formerly CloverETL) to work with Microsoft Project as sources and destinations. In this article, you will use the JDBC Driver for Microsoft Project to set up a simple transfer into a flat file. The CData JDBC Driver for Microsoft Project enables you to use the data transformation components in CloverDX (formerly CloverETL) to work with Microsoft Project as sources and destinations. In this article, you will use the JDBC Driver for Microsoft Project to set up a simple transfer into a flat file.

Connect to Microsoft Project as a JDBC Data Source

  1. Create the connection to Microsoft Project data. In a new CloverDX graph, right-click the Connections node in the Outline pane and click Connections -> Create Connection. The Database Connection wizard is displayed.
  2. Click the plus icon to load a driver from a JAR. Browse to the lib subfolder of the installation directory and select the cdata.jdbc.microsoftproject.jar file.
  3. Enter the JDBC URL.

    The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

    Built-in Connection String Designer

    For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

    java -jar cdata.jdbc.microsoftproject.jar
    

    Fill in the connection properties and copy the connection string to the clipboard.

    👁 Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

    A typical JDBC URL is below:

    jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
👁 Required connection properties specified in the JDBC URL. (Salesforce is shown.)

Query Microsoft Project Data with the DBInputTable Component

  1. Drag a DBInputTable from the Readers selection of the Palette onto the job flow and double-click it to open the configuration editor.
  2. In the DB connection property, select the Microsoft Project JDBC data source from the drop-down menu.
  3. Enter the SQL query. For example:
    SELECT ProjectName, ProjectActualCost FROM Projects

Write the Output of the Query to a UniversalDataWriter

  1. Drag a UniversalDataWriter from the Writers selection onto the jobflow.
  2. Double-click the UniversalDataWriter to open the configuration editor and add a file URL.
  3. Right-click the DBInputTable and then click Extract Metadata.
  4. Connect the output port of the DBInputTable to the UniversalDataWriter.
  5. In the resulting Select Metadata menu for the UniversalDataWriter, choose the Projects table. (You can also open this menu by right-clicking the input port for the UniversalDataWriter.)
  6. Click Run to write to the file.
👁 A simple transfer to a flat file.

Ready to get started?

Download a free trial of the MS Project Driver to get started: