VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-coginiti-pro.rst

⇱ Access Live Microsoft Project Data in Coginiti Pro


Access Live Microsoft Project Data in Coginiti Pro

πŸ‘ Dibyendu Datta
Dibyendu Datta
Lead Technology Evangelist
Connect to and query live Microsoft Project data from the GUI in the Coginiti Pro: SQL Analytics Tool.

Coginiti Pro is a single tool for all your SQL data and analytics needs, designed specifically for data engineers, analysts, and data scientists. When paired with the CData JDBC Driver for MS Project, Coginiti Pro can access and query live Microsoft Project data. This article describes how to connect to and query Microsoft Project data from Coginiti Pro.

With built-in optimized data processing, the CData JDBC Driver for MS Project offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). In addition, its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.

Gather Connection Properties and Build a Connection String

Download the CData JDBC Driver for MS Project installer, unzip the package, and run the JAR file to install the driver. Then gather the required connection properties.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

NOTE: To use the JDBC driver in Coginiti Pro, you may need a license (full or trial) and a Runtime Key (RTK). For more information on obtaining this license (or a trial), contact our sales team.

Built-in Connection String Designer

For assistance constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Double-click the JAR file or execute the jar file from the command line.

java -jar cdata.jdbc.microsoftproject.jar
πŸ‘ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

Fill in the connection properties (including the RTK) and copy the connection string to the clipboard.

Create a JDBC Data Source for Microsoft Project Data

  1. Open Coginiti Pro and in the File menu, select "Edit Drivers."
  2. In the newly opened wizard, click "Add" and select "Generic." πŸ‘ Adding a Generic JDBC Driver.
  3. In the "JDBC Drivers" wizard, set the driver properties (below) and click "Create Driver."

    • Set JDBC Driver Name to a useful name, like CData JDBC Driver for Microsoft Project.
    • Click "Add Files" to add the JAR file from the "lib" folder in the installation directory (e.g. cdata.jdbc.microsoftproject.jar)
    • Select the Class Name: cdata.jdbc.microsoftproject.MicrosoftProjectDriver.
    πŸ‘ Creating a new Generic data source (Salesforce is shown).

Create a Connection using the CData JDBC Driver for MS Project

  1. In the File menu, click "Edit Connections."
  2. In the newly opened wizard, click "Add" and select "Generic." πŸ‘ Adding a Generic JDBC Connection.
  3. In the "Connections" wizard, set the connection properties.
    • Set Connection name to an identifying name.
    • Set Database JDBC driver to the Driver you configured earlier.
    • Set JDBC URL to the JDBC URL configured using the built-in connection string designer (e.g. jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
    πŸ‘ Creating a connection (Salesforce is shown).
  4. Click "Test" to ensure the connection is configured properly. Click "Save."

Query Microsoft Project Using SQL

  1. Open the Connections tab by clicking on database icon: .
  2. Click the plus sign () to add a new query tab.
  3. Once the query console is open, write the SQL script you wish to execute and click "Run at Cursor".

    NOTE: You can use the explorer on the left to determine table/view names and column names.

    Using the explorer

    1. In the "Select connection" field, select the connection you wish to query.
    2. Expand your newly created connection, expand the "CData" catalog, and expand the Microsoft Project catalog.
    3. Expand "Tables" or "Views" to find the entity you wish to query.
    4. Expand your selected entity to explore the fields (columns).
    πŸ‘ Querying data (Salesforce is shown).

Free Trial & More Information

Download a free, 30-day trial of the CData JDBC Driver for MS Project and start working with your live Microsoft Project data in Coginiti Pro. Reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!