How to Connect DBeaver to Microsoft Project via a JDBC Driver

πŸ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Manage Microsoft Project data with visual tools in DBeaver like the query browser.

The CData JDBC Driver for MS Project implements JDBC standards that enable third-party tools to interoperate, from wizards in IDEs to business intelligence tools. This article shows how to connect to Microsoft Project data with wizards in DBeaver and browse data in the DBeaver GUI.

Create a JDBC Data Source for Microsoft Project Data

Follow the steps below to load the driver JAR in DBeaver.

  1. Open the DBeaver application and, in the "Database" menu, select the "Driver Manager" option. Click "New" to open the "Create new driver" form.
  2. In the Settings tab:
    • Set Driver Name to a user-friendly name for the driver (e.g. CData JDBC Driver for MS Project).
    • Set Class Name to the class name for the JDBC driver: cdata.jdbc.microsoftproject.MicrosoftProjectDriver.
    • Set URL Template to jdbc:microsoftproject:.
    πŸ‘ Configure the new driver settings (Salesforce is shown).
  3. In the Libraries tab, click "Add File," navigate to the "lib" folder in the installation directory (C:\Program Files\CData[product_name] XXXX\) and select the JAR file (cdata.jdbc.MicrosoftProject.jar). πŸ‘ Loading the JDBC JAR file (Salesforce is shown).

Create a Connection to Microsoft Project Data

Follow the steps below to add credentials and other required connection properties.

  1. In the "Database" menu, click "New Database Connection."
  2. In the "Connect to a database" wizard that results, select the driver you just created (e.g. CData JDBC Driver for MS Project) and click "Next >." πŸ‘ Selecting the driver (Salesforce is shown).
  3. On the Main tab of the configuration wizard, set the JDBC URL, using the required connection properties:

    The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

    Built-in Connection String Designer

    For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

    java -jar cdata.jdbc.microsoftproject.jar
    

    Fill in the connection properties and copy the connection string to the clipboard.

    πŸ‘ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

    Below is a typical connection string:

    jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
    
    πŸ‘ Configuring the JDBC URL (Salesforce is shown).
  4. Click "Test Connection ..." to ensure you have configured the connection properly. πŸ‘ A successfully configured connection (Salesforce is shown).
  5. Click "Finish."

Query Microsoft Project Data

You can now query information from the tables exposed by the connection: Right-click a Table and then click View Table. The data is available on the Data tab.

πŸ‘ The results of a query in DBeaver. (Salesforce is shown.)

More Information & Free Trial

Download a free, 30-day trial of the CData JDBC Driver for MS Project and start working with your live Microsoft Project data in DBeaver. Join the CData Community or reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!