VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-etl-validator.rst

⇱ How to Work with Microsoft Project Data in ETL Validator JDBC


How to Work with Microsoft Project Data in ETL Validator JDBC

πŸ‘ Dibyendu Datta
Dibyendu Datta
Lead Technology Evangelist
Connect to Microsoft Project from ETL Validator jobs using the CData JDBC Driver.

ETL Validator provides data movement and transformation capabilities for integrating data platforms across your organization. CData's JDBC driver seamlessly integrates with ETL Validator and extends its native connectivity to include Microsoft Project data.

This tutorial explains how to build a simple ETL validator data flow to extract data from Microsoft Project data and load it into an example data storage solution: SQL Server.

Add a new ETL Validator data source via CData

CData extends ETL Validator's data connectivity capabilities by providing the ability to add data sources that connect via CData's JDBC drivers. Connecting to Microsoft Project data simply requires creating a new data source in ETL Validator through CData's connectiviy suite as described below.

Login to ETL Validator

Begin by logging into ETL Validator to view the application dashboard.

πŸ‘ Access the ETL Validator dashboard

Click on Add a DataSource

CData extends the data source options within ETL Validator.

πŸ‘ Create a new DataSource

Click on CData

CData's connectivity is embedded within ETL Validator's data source options.

πŸ‘ CData data source

Configure the CData Driver Connection String

You will need a JDBC connection string to establish a connection to Microsoft Project in ETL Validator.

πŸ‘ CData data source

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

Built-in Connection String Designer

For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

java -jar cdata.jdbc.microsoftproject.jar

πŸ‘ Using the built-in connection string designer to generate a JDBC URL (microsoft project is shown.)

A typical connection string looks like this:

jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;

Licensing the Driver

To ensure the JDBC driver is licensed appropriately, copy the license file to the appropriate location:

Copy the JDBC Driver for Microsoft Project and lic file from "C:\Program Files\CData[product_name]\lib" to "C:\Datagaps\ETLValidator\Server\apache-tomcat\bin".

 cdata.jdbc.microsoftproject.jar
 cdata.jdbc.microsoftproject.lic
 

Note: If you do not copy the .lic file with the jar, you will see a licensing error that indicates you do not have a valid license installed. This is true for both the trial and full versions.

Save the connection

Should you encounter any difficulties loading the CData JDBC driver class, please contact DataGap's team, and they will provide you instructions on how to load the jar file for the relevant driver.

Add SQL Server as a Target

This example will use SQL Server as a destination for Microsoft Project data data, but any preferred destination can be used instead.

Go to DataSources and select MS_SQL_SERVER

This option is the default.

πŸ‘ Add SQL Server

Fill in the necessary connection details and test the connection

The details will depend on the specific target, but these details may include a URL, authentiation credentials, etc.

πŸ‘ Add SQL Server

Create a Dataflow in ETL Validator

Open the Dataflows tab

Configured data flows will appear in this window.

πŸ‘ Dataflows tab

Select Create Dataflow

Name your new dataflow and save it.

Open the Dataflow to view the Dataflow Diagram

The details of the data movement will be configured in this panel.

πŸ‘ Dataflow diagram

Drag & drop the JDBC as a source from the right side

Give the new source an appropriate name and save it.

πŸ‘ Jira example source

Fill in the Query section of the new source

Select the Table from the Schema option that reflects which data should be pulled from Microsoft Project data.

View the expected results of your query

The anticipated outcome of the configured query is displayed in the Result tab.

πŸ‘ Query results

Add the destination to the Dataflow

Select Switch to Diagram, then drag & drop the DB Sink as a target from the right side (under Sink options). Give the sink an appropriate name and save it.

πŸ‘ Data sink

Set the appropriate Schema for the destination

Choose the Schema and table that matches the structure of the source table. For this example, the table on the target side was created to match the Source so that data flow seamlessly. More advanced schema transformation operations are beyond the scope of this article.

πŸ‘ Destination schema

Hit the RUN option to begin replication

Running the job will take some time.

πŸ‘ Destination schema

View the finished Dataflow

Return to the diagram to see the finished data replication job from Microsoft Project data to SQL Server.

πŸ‘ Full dataflow

Get Started Today

Download a free, 30-day trial of the CData JDBC Driver for Microsoft Project and start building Microsoft Project-connected applications with ETL Validator. Reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!