VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-hulft-integrate.rst

โ‡ฑ Connect to Microsoft Project Data in HULFT Integrate


Connect to Microsoft Project Data in HULFT Integrate

๐Ÿ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Connect to Microsoft Project as a JDBC data source in HULFT Integrate

HULFT Integrate is a modern data integration platform that provides a drag-and-drop user interface to create cooperation flows, data conversion, and processing so that complex data connections are easier than ever to execute. When paired with the CData JDBC Driver for MS Project, HULFT Integrate can work with live Microsoft Project data. This article explains how to connect to Microsoft Project and move the data into a CSV file.

With built-in optimized data processing, the CData JDBC driver offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). Its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.

Enable Access to Microsoft Project

To enable access to Microsoft Project data from HULFT Integrate projects:

  1. Copy the CData JDBC Driver JAR file (and license file if it exists), cdata.jdbc.microsoftproject.jar (and cdata.jdbc.microsoftproject.lic), to the jdbc_adapter subfolder for the Integrate Server
  2. Restart the HULFT Integrate Server and launch HULFT Integrate Studio

Build a Project with Access to Microsoft Project Data

Once you copy the JAR files, you can create a project with access to Microsoft Project data. Start by opening Integrate Studio and creating a new project.

  1. Name the project
  2. Ensure the "Create script" checkbox is checked
  3. Click Next ๐Ÿ‘ Creating a new project.
  4. Name the script (e.g.: MicrosoftProjecttoCSV)

Once you create the project, add components to the script to copy Microsoft Project data to a CSV file.

Configure an Execute Select SQL Component

Drag an "Execute Select SQL" component from the Tool Palette (Database -> JDBC) into the Script workspace.

  1. In the "Required settings" tab for the Destination, click "Add" to create a new connection for Microsoft Project. Set the following properties:
    • Name: Microsoft Project Connection Settings
    • Driver class name: cdata.jdbc.microsoftproject.MicrosoftProjectDriver
    • URL: jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;

      ๐Ÿ‘ JDBC connection settings (Salesforce is shown).

      Built-in Connection String Designer

      For assistance constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the JAR file from the command-line.

      		java -jar cdata.jdbc.microsoftproject.jar
      		

      Fill in the connection properties and copy the connection string to the clipboard.

      The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

      ๐Ÿ‘ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)
  2. Write your SQL statement. For example:
    SELECT ProjectName, ProjectActualCost FROM Projects
  3. Click "Extraction test" to ensure the connection and query are configured properly
  4. Click "Execute SQL statement and set output schema"
  5. Click "Finish" ๐Ÿ‘ Configuring the Execute Select SQL operation

Configure a Write CSV File Component

Drag a "Write CSV File" component from the Tool Palette (File -> CSV) onto the workspace.

  1. Set a file to write the query results to (e.g. Projects.csv)
  2. Set "Input data" to the "Select SQL" component
  3. Add columns for each field selected in the SQL query
  4. In the "Write settings" tab, check the checkbox to "Insert column names into first row"
  5. Click "Finish"

Map Microsoft Project Fields to the CSV Columns

Map each column from the "Select" component to the corresponding column for the "CSV" component.

Finish the Script

Drag the "Start" component onto the "Select" component and the "CSV" component onto the "End" component. Build the script and run the script to move Microsoft Project data into a CSV file.

๐Ÿ‘ A completed script.

Download a free, 30-day trial of the CData JDBC Driver for MS Project and start working with your live Microsoft Project data in HULFT Integrate. Reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

๐Ÿ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!