VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-intellij.rst

⇱ How to connect to Microsoft Project Data from IntelliJ


How to connect to Microsoft Project Data from IntelliJ

👁 Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Integrate connectivity to Microsoft Project data with wizards in IntelliJ.

The CData JDBC Driver for Microsoft Project enables you to access Microsoft Project as a JDBC data source, providing integration with rapid development tools in IDEs. This article shows how to use the data source configuration wizard to connect to Microsoft Project data in IntelliJ.

Create a JBDC Data Source for Microsoft Project

Follow the steps below to add the driver JAR and define connection properties required to connect to Microsoft Project data.

  1. In the Data Sources window, right-click and then click Add Data Source -> DB Data Source.
  2. In the Data Source Properties dialog that appears, the following properties are required:

    • JDBC Driver Files: Click the button next to this menu to add the JDBC Driver file cdata.jdbc.microsoftproject.jar, located in the installation directory.
    • JDBC Driver Class: In this menu, select cdata.jdbc.microsoftproject.MicrosoftProjectDriver from the list.
    • Database URL: Enter the connection URL in the JDBC URL property. The URL must start with jdbc:microsoftproject: and includes connection properties separated with semicolons.

      The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

      Built-in Connection String Designer

      For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

      java -jar cdata.jdbc.microsoftproject.jar
      

      Fill in the connection properties and copy the connection string to the clipboard.

      👁 Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

      A typical JDBC URL is the following:

      jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
👁 The JDBC data source. (Salesforce is shown.)

Edit and Save Microsoft Project Data

To discover schema information, right-click the data source you just created and click Refresh Tables. To query a table, right-click it and then click Open Tables Editor. You can also modify records in the Table Editor.

👁 The results of a query in IntelliJ. (Salesforce is shown.)

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

👁 Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!