![]() |
VOOZH | about |
CData JDBC drivers can be configured in JBoss by following the standard procedure for connection pooling. This article details how to access Microsoft Project data from a connection pool in JBoss applications. This article details how to use the JBoss Management Interface to configure the CData JDBC Driver for Microsoft Project. You will then access Microsoft Project data from a connection pool.
Follow the steps below to add the driver JAR and define required connection properties.
java:jboss/root/jdbc/MicrosoftProject
Enter the JDBC URL and the username and password. The syntax of the JDBC URL is jdbc:microsoftproject: followed by a semicolon-separated list of connection properties.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard.
👁 Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)A typical connection string is below:
jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
The steps above show how to configure the driver in a simple connection pooling scenario. For more information, refer to the Data Source Management chapter in the JBoss EAP documentation.
Download a free trial of the MS Project Driver to get started:
Download NowLearn more:
👁 Microsoft Project IconRapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!