VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-kafka.rst

โ‡ฑ Stream Microsoft Project Data into Apache Kafka Topics


Stream Microsoft Project Data into Apache Kafka Topics

๐Ÿ‘ Dibyendu Datta
Dibyendu Datta
Lead Technology Evangelist
Access and stream Microsoft Project data in Apache Kafka using the CData JDBC Driver and the Kafka Connect JDBC connector.

Apache Kafka is an open-source stream processing platform that is primarily used for building real-time data pipelines and event-driven applications. When paired with the CData JDBC Driver for MS Project, Kafka can work with live Microsoft Project data. This article describes how to connect, access and stream Microsoft Project data into Apache Kafka Topics and to start Confluent Control Center to help users secure, manage, and monitor the Microsoft Project data received using Kafka infrastructure in the Confluent Platform.

With built-in optimized data processing, the CData JDBC Driver offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). Its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.

Prerequisites

Before connecting the CData JDBC Driver for streaming Microsoft Project data in Apache Kafka Topics, install and configure the following in the client Linux-based system.

  1. Confluent Platform for Apache Kafka
  2. Confluent Hub CLI Installation
  3. Self-Managed Kafka JDBC Source Connector for Confluent Platform

Define a New JDBC Connection to Microsoft Project data

  1. Download CData JDBC Driver for MS Project on a Linux-based system
  2. Follow the given instructions to create a new directory extract all the driver contents into it:
    1. Create a new directory named Microsoft Project
      		mkdir MicrosoftProject
      		
    2. Move the downloaded driver file (.zip) into this new directory
      		mv MicrosoftProjectJDBCDriver.zip MicrosoftProject/
      		
    3. Unzip the CData MicrosoftProjectJDBCDriver contents into this new directory
      		unzip MicrosoftProjectJDBCDriver.zip
      		
  3. Open the Microsoft Project directory and navigate to the lib folder
    ls
    cd lib/
    
  4. Copy the contents of the lib folder of the CData JDBC Driver for MS Project into the lib folder of Kafka Connect JDBC. Check the Kafka Connect JDBC folder contents to confirm that the cdata.jdbc.microsoftproject.jar file is successfully copied into the lib folder
    cp -r /path/to/CData JDBC Driver for MS Project/lib/* /usr/share/confluent-hub-components/confluentinc-kafka-connect-jdbc/lib/
    cd /usr/share/confluent-hub-components/confluentinc-kafka-connect-jdbc/lib/
    
  5. Install the CData Microsoft Project JDBC driver license using the given command, followed by your Name and Email ID
    	java -jar cdata.jdbc.microsoftproject.jar -l
    	
  6. Enter the product key or "TRIAL" (In the scenarios of license expiry, please contact our CData Support team)
  7. Start the Confluent local services using the command:
    	confluent local services start
    	

    This starts all the Confluent Services like Zookeeper, Kafka, Schema Registry, Kafka REST, Kafka CONNECT, ksqlDB and Control Center. You are now ready to use the CData JDBC driver for Microsoft Project to stream messages using Kafka Connect Driver into Kafka Topics on ksqlDB.

    ๐Ÿ‘ Start the Confluent local services
  8. Create the Kafka topics manually using a POST HTTP API Request:
     curl --location 'server_address:8083/connectors' 
    	--header 'Content-Type: application/json'
    	--data '{ 
    		"name": "jdbc_source_cdata_microsoftproject_01", 
    		"config": { 
    			"connector.class": "io.confluent.connect.jdbc.JdbcSourceConnector", 
    			"connection.url": "jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;",
    		"topic.prefix": "microsoftproject-01-", 
    		"mode": "bulk" 
    		} 
    	}'
    

    Let us understand the fields used in the HTTP POST body (shown above):

    • connector.class: Specifies the Java class of the Kafka Connect connector to be used.
    • connection.url: The JDBC connection URL to connect with Microsoft Project data.

      Built-in Connection String Designer

      For assistance in constructing the JDBC URL, use the connection string designer built into the CData JDBC Driver for MS Project. Either double-click the JAR file or execute the jar file from the command-line.

      		java -jar cdata.jdbc.microsoftproject.jar
      		

      Fill in the connection properties and copy the connection string to the clipboard.

      The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

      ๐Ÿ‘ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)
    • topic.prefix: A prefix that will be added to the Kafka topics created by the connector. It's set to "microsoftproject-01-".
    • mode: Specifies the mode in which the connector operates. In this case, it's set to "bulk", which suggests that the connector is configured to perform bulk data transfer.

    This request adds all the tables/contents from Microsoft Project as Kafka Topics.

    Note: The IP Address (server) to POST the request (shown above) is the Linux Network IP Address.

  9. Run ksqlDB and list the topics. Use the commands:
    ksql
    list topics;
    
    ๐Ÿ‘ List the Kafka Topics (BigCommerce is shown)
  10. To view the data inside the topics, type the SQL Statement:
    PRINT topic FROM BEGINNING;
    

Connecting with the Confluent Control Center

To access the Confluent Control Center user interface, ensure to run the "confluent local services" as described in the above section and type http://<server address>:9021/clusters/ on your local browser.

๐Ÿ‘ Connect with Confluent Control Center

Get Started Today

Download a free, 30-day trial of the CData JDBC Driver for MS Project and start streaming Microsoft Project data into Apache Kafka. Reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

๐Ÿ‘ Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!