Integrate Microsoft Project Data in the Pentaho Report Designer

๐Ÿ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Publish reports based on Microsoft Project data in the Pentaho BI tool.

The CData JDBC driver for Microsoft Project data enables access to live data from dashboards and reports. This article shows how to connect to Microsoft Project data as a JDBC data source and publish reports based on Microsoft Project data in Pentaho.

Connect and Create a Report

  1. Copy the JAR file of the driver, located in the lib subfolder of the installation directory, to the \Report-Designer\lib\jdbc\ folder in the Pentaho directory.
  2. Run the report-designer.bat file in the \Report-Designer\ folder to open the Report-Designer UI.
  3. Create a new data source with the driver by clicking Data -> Add Data Source -> Advanced -> JDBC (Custom) and then creating a new Microsoft Project connection. In the resulting dialog, configure the connection properties as shown below.

    • Custom Connection URL property: Enter the JDBC URL. This starts with jdbc:microsoftproject: and is followed by a semicolon-separated list of connection properties.

      The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

      Built-in Connection String Designer

      For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

      java -jar cdata.jdbc.microsoftproject.jar
      

      Fill in the connection properties and copy the connection string to the clipboard.

      ๐Ÿ‘ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

      When you configure the JDBC URL, you may also want to set the Max Rows connection property. This will limit the number of rows returned, which is especially helpful for improving performance when designing reports and visualizations.

      Below is a typical JDBC URL:

      jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
    • Custom Driver Class Name: Enter cdata.jdbc.microsoftproject.MicrosoftProjectDriver.
    • User Name: The username to authenticate with.
    • Password: The password to authenticate with.
    ๐Ÿ‘ Required connection properties defined in the JDBC URL. (Salesforce is shown.)

Add Microsoft Project Data to a Report

You are now ready to create a report with Microsoft Project data.

  1. Add the Microsoft Project source to your report: Click Data -> Add Data Source -> JDBC and select the data source.

  2. Configure the query. This article uses the one below:

    SELECT ProjectName, ProjectActualCost FROM Projects
    ๐Ÿ‘ The query to retrieve data, specified in the JDBC data source configuration wizard. (Salesforce is shown.)
  3. Drag a chart onto your report and double-click it to edit the chart. Run the report to display the chart. You can use the results of this query to create a simple chart for the Projects table.
  4. Finally, run the report to see the chart.
๐Ÿ‘ A chart generated from up-to-date data. (Salesforce is shown.)

Ready to get started?

Download a free trial of the MS Project Driver to get started: