VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-jdbc-tomcat.rst

⇱ Configure the CData JDBC Driver for Microsoft Project in a Connection Pool in Tomcat


Configure the CData JDBC Driver for Microsoft Project in a Connection Pool in Tomcat

👁 Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Connect to Microsoft Project data from a connection pool in Tomcat.

The CData JDBC Drivers support standard JDBC interfaces to integrate with Web applications running on the JVM. This article details how to connect to Microsoft Project data from a connection pool in Tomcat.

Connect to Microsoft Project Data through a Connection Pool in Tomcat

  1. Copy the CData JAR and CData .lic file to $CATALINA_HOME/lib. The CData JAR is located in the lib subfolder of the installation directory.
  2. Add a definition of the resource to the context. Specify the JDBC URL here.

    The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

    Built-in Connection String Designer

    For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.

    java -jar cdata.jdbc.microsoftproject.jar
    

    Fill in the connection properties and copy the connection string to the clipboard.

    👁 Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)

    You can see the JDBC URL specified in the resource definition below.

    <Resource name="jdbc/microsoftproject" auth="Container" type="javax.sql.DataSource" driverClassName="cdata.jdbc.microsoftproject.MicrosoftProjectDriver" factory="org.apache.tomcat.jdbc.pool.DataSourceFactory" url="jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;" maxActive="20" maxIdle="10" maxWait="-1" />
    

    To allow a single application to access Microsoft Project data, add the code above to the context.xml in the application's META-INF directory.

    For a shared resource configuration, add the code above to the context.xml located in $CATALINA_BASE/conf. A shared resource configuration provides connectivity to Microsoft Project for all applications.

  3. Add a reference to the resource to the web.xml for the application.
     Microsoft Project data JSP
     jdbc/MicrosoftProject
     javax.sql.DataSource
     Container
    
    
  4. Initialize connections from the connection pool:
    Context initContext = new InitialContext();
    Context envContext = (Context)initContext.lookup("java:/comp/env");
    DataSource ds = (DataSource)envContext.lookup("jdbc/MicrosoftProject");
    Connection conn = ds.getConnection();
     

More Tomcat Integration

The steps above show how to connect to Microsoft Project data in a simple connection pooling scenario. For more use cases and information, see the JNDI Datasource How-To in the Tomcat documentation.

Ready to get started?

Download a free trial of the MS Project Driver to get started:

 Download Now

Learn more:

👁 Microsoft Project Icon
MS Project JDBC Driver

Rapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!