![]() |
VOOZH | about |
The CData JDBC Driver for Microsoft Project enables you to follow standard procedures to integrate Microsoft Project data into Java Web applications. This article shows how to deploy the CData JDBC Driver for Microsoft Project in WebLogic Server.
To deploy the driver, add the driver JAR to your classpath. The .lic file must be located in the same folder as the JAR. These files are located in the lib subfolder of the installation directory.
If you want to add the driver to all domains, prepend the path to the JAR to the WEBLOGIC_CLASSPATH environment variable in WL_HOME\common\bin\commEnv.cmd/sh. This script is located in WL_HOME\common\bin\. For example:
set WEBLOGIC_CLASSPATH=your-installation-directory\lib\cdata.jdbc.microsoftproject.jar;%WEBLOGIC_CLASSPATH%
In WebLogic 12.2.1 if you want to add the driver to a specific domain, you can simply place the driver JAR and .lic file into DOMAIN_HOME\lib; for example, ORACLE_HOME\user_projects\domains\MY_DOMAIN\lib. These files will be added to the server classpath at startup.
Earlier versions require that you manually add the driver to the classpath: Prepend the following to the PRE_CLASSPATH environment variable in setDomainEnv.cmd/sh. This script is located in the bin subfolder of the folder for that domain.
set PRE_CLASSPATH=your-installation-directory\lib\cdata.jdbc.microsoftproject.jar;%PRE_CLASSPATH%
After making these changes, restart the server.
After deploying the driver, log into the WebLogic Administration Console and create the connection.
Database Type: Select Other.
Click Next to use the default options. On the last page, enter the following information and click Test Configuration:
URL: Enter the JDBC URL. A typical JDBC URL is below:
jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard.
๐ Using the built-in connection string designer to generate a JDBC URL (Salesforce is shown.)After selecting the server where you want to deploy the JDBC data source, you can now connect to Microsoft Project data.
๐ The data source deployed on the target server and enabled for connection pooling. (Salesforce is shown.)The steps above show how configure the driver in a simple connection pooling scenario. For more use cases and information, see the JDBC sections in the WebLogic Data Sources chapter of the Oracle Fusion Middleware documentation.
Download a free trial of the MS Project Driver to get started:
Download NowLearn more:
๐ Microsoft Project IconRapidly create and deploy powerful Java applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!