![]() |
VOOZH | about |
Cline is an autonomous coding agent right in your IDE, capable of creating/editing files, running commands, using the browser, and more with your permission every step of the way. When paired with CData Code Assist MCP for MS Project, you get live access to CRM data within your IDE, enabling you to build, test, and validate data-driven features using real-time schema and records without ever leaving your development environment.
CData Code Assist MCP provides schema-aware context to AI tools — whether you're using it for AI-assisted code generation in IDEs like Cursor and Cline, or for querying live data through chat interfaces like Claude Desktop.
This article outlines how to run CData Code Assist MCP for MS Project on WSL (Windows Subsystem for Linux) and connect to it from the Cline extension in Visual Studio Code on Windows.
Code Assist MCP is typically designed for clients like Claude Desktop. However, when attempting to use it via the Cline extension in Windows VS Code, the following error occurred:
MCP error -32000: Connection closed
This issue is suspected to be caused by I/O handling problems in the stdio transport implementation on the Windows version of the Cline extension.
Before running Code Assist MCP in WSL, you must complete authentication flow in a Windows environment. This ensures all necessary credentials are generated and stored properly. Find and run "CData Code Assist MCP for MS Project" or execute the JAR file to open the configuration wizard.
java -jar "C:\Program Files\CData\CData Code Assist MCP for Microsoft Project 20XX\lib\cdata.mcp.microsoftproject.jar"
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
Name your configuration (e.g. cdatamicrosoftproject), enter the required connection properties, and click "Connect."
👁 The Code Assist MCP configuration wizard (Google Sheets is shown).Upon successful connection, the following directory and files will be created:
C:\Users\<username>\AppData\Roaming\CData\microsoftproject Provider\ |-- cdatamicrosoftproject.mcp |-- (other supporting config files)
Next, copy the entire configuration folder from Windows into your WSL environment.
mkdir -p ~/.config/CData/ cp -r /mnt/c/Users/<username>/AppData/Roaming/CData/"microsoftproject Provider" ~/.config/CData/
Ensure the destination path matches exactly: ~/.config/CData/microsoftproject Provider/.
Install Java and place the Code Assist MCP JAR in the desired location within WSL:
sudo apt update sudo apt install openjdk-21-jre-headless sudo mkdir -p /opt/cdata/mcp_microsoftproject/lib sudo cp /mnt/c/Program\ Files/CData/CData\ Code\ Assist\ MCP\ for\ Microsoft Project\ 20XX/lib/cdata.mcp.microsoftproject.jar /opt/cdata/mcp_microsoftproject/lib/
Now, configure the Cline extension to launch Code Assist MCP inside WSL using the wsl command.
Create or update cline_mcp_settings.json with the following content:
{
"mcpServers": {
"cdatamicrosoftproject": {
"autoApprove": ["*"],
"disabled": false,
"timeout": 60,
"type": "stdio",
"command": "wsl",
"args": [
"-d",
"Ubuntu", // Replace with your installed WSL distro name
"--",
"/usr/bin/java",
"-jar",
"/opt/cdata/mcp_microsoftproject/lib/cdata.mcp.microsoftproject.jar",
"cdatamicrosoftproject"
],
"env": {
"JAVA_TOOL_OPTIONS": "-Xmx2g"
}
}
}
}
Note: Replace Ubuntu with your actual WSL distribution name (e.g., Ubuntu-22.04). Run wsl -l in PowerShell or CMD to confirm.
From within Visual Studio Code, you can now run MCP commands through the Cline extension.
cdatamicrosoftproject_get_tables cdatamicrosoftproject_get_columns Projects
If configured correctly, these commands will return a list of available Microsoft Project objects and metadata, allowing you to interact with your CRM schema in real time.
Try natural language prompts like:
Download Code Assist MCP for free and give your AI tools schema-aware access to live Microsoft Project data during development. When you're ready to move to production, CData Microsoft Project Drivers deliver the same SQL-based access with enterprise-grade performance, security, and reliability.
Visit the CData Community to share insights, ask questions, and explore what's possible with MCP-powered AI workflows.
Download a free MS Project Code Assist MCP to get started:
Download NowLearn more:
👁 Microsoft Project IconThe CData Code Assist MCP for Microsoft Project provides schema-aware context for AI-assisted code generation with live Microsoft Project data.