Slingshot (formerly known as Reveal BI) is a data-driven work management suite that brings together analytics,
team and project coordination, content sharing, and communication in a single platform. With
CData API Server, you can generate OData APIs
for live Microsoft Project data that are seamlessly consumable within Slingshot.
In this guide, we'll walk you through a step-by-step process to generate OData endpoints
for Microsoft Project using CData API Server, and bring those endpoints into Slingshot to
create real-time dashboards and streamline data analysis.
Let's begin!
Prerequisites
-
CData API Server: Download a free trial from
here.
-
Slingshot Account and App: Log in or sign up and download from
here.
-
An active Microsoft Project account containing your data.
Overview
Here's an overview of the steps:
-
Install the CData API Server, configure a connection to the Microsoft Project, and generate
OData API endpoints for Microsoft Project data within the API Server for use in Slingshot.
-
Connect these endpoints in Slingshot to build interactive dashboards and perform real-time analysis.
Step 1: Install, Configure, and Connect CData API Server to Microsoft Project
1.1 Install the API Server
If you haven't already, download and install the CData API Server.
Follow the installation wizard to complete the setup for your machine.
Once installed, you can start the server in the following ways:
-
Windows: CData API Server runs as a service by default. Ensure the service is
running, then open http://localhost:8080/ in your browser to access the API Server admin console.
-
Linux/Mac: You can run the server manually or as a service. To start it manually, navigate to
the installation directory and run java -jar apiserver.jar
-
Alternatively, run service.sh with root privileges to set up API Server as a Linux system service.
1.2 Enable CORS
If the Slingshot app and API Server are hosted on different domains, CORS (Cross-Origin Resource Sharing) must be
enabled to allow cross-domain communication. To enable CORS in the API Server:
- Go to Settings and click the icon to edit CORS settings.
- Enable Cross-Origin Resource Sharing (CORS).
- Enable Allow all domains without '*' to accept any origin.
- In Access-Control-Allow-Origin, enter your Microsoft Project origin domain
or use * to allow all domains. This is suitable for public APIs.
- Enable Access-Control-Allow-Credentials to allow cookies and auth headers.
- In Access-Control-Allow-Methods, enter GET, PUT, POST, OPTIONS.
- In Access-Control-Allow-Headers, enter Authorization, Content-Type.
- Set Access-Control-Max-Age (default: 3600 seconds) to cache preflight requests.
- Click Save.
π Enable CORS Settings in the CData API Server
1.3 Configure the Microsoft Project Connection in API Server
-
Go to Settings and click
Add Connection in the top-right.
-
Select Microsoft Project. If it's not visible, toggle off
Only Installed to view all connectors.
-
Click Install Connector to auto-install.
For manual setup, choose Manual Install and upload the ZIP file.
-
Once installed, click Microsoft Project again to open its connection settings and
configure using the details below.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user
credentials. In addition, specify a URL to a valid Microsoft Project server organization root or
Microsoft Project services file.
- Click Save & Test to validate and complete the connection setup.
π Adding a Connection in the CData API Server (Salesforce is Shown)
1.4. Add and Configure Users
To allow secure access to the OData endpoints, you need to create and configure users in the CData API Server.
Each user will have authentication credentials and role-based access control, ensuring that only authorized
users can query the connected data.
-
Go to Users from the navigation pane, then click
Add User in the top-right corner.
- Enter a Username and set a secure Password for the user.
- Select a Role:
- Admin: Full access to all features including settings and connections.
- Query: Limited to data access via API endpoints (suitable for Slingshot use).
- (Optional) Configure rate limits:
- Requests Per Hour: Number of allowed API calls per hour (default: 1000).
- Max Concurrent Requests: Number of parallel API requests allowed (default: 10).
- Define Privileges for the user:
- GET: Allows data retrieval.
- POST: Allows creation of new records.
- PUT, MERGE, PATCH: Allows updates to existing records.
- DELETE: Allows deletion of records.
- Click Add User to save and activate the user account.
π Adding a User in the CData API Server
Once a user is created, an Authtoken is automatically generated. This token can be
used in API requests as a secure authentication method in place of the password.
You can also refresh the Authtoken, disable it, or set expiration rules (e.g., number of days until expiry)
by enabling the Token Expiration option in the user settings.
π Authtoken Settings for the Added User in CData API Server
1.5. Add Tables for the Endpoint
To make your data available to Slingshot via OData, you need to expose your desired tables through the API Server:
-
In the CData API Server, go to API from the left navigation, then click
Add Table at the top-right.
-
Select the Microsoft Project connection you configured earlier, then click Next.
-
Browse available entities and schema by expanding the Tables section.
Select individual tables or click the TABLE NAME checkbox
on top to select all tables. Then, click Confirm.
π Adding Tables for API Endpoint in CData API Server
1.6. Access and Use Endpoints in Slingshot
Now that your API is configured, Slingshot can connect to the OData endpoints to visualize live data.
Use the following endpoint URL formats to access your API resources:
| Endpoint |
|
URL |
| Entity List |
http://address:port/api.rsc/ |
| Table Metadata (e.g., albums) |
http://address:port/api.rsc/albums/$metadata?@json |
| Table Data (e.g., albums) |
http://address:port/api.rsc/albums |
These OData endpoints can now be consumed directly in Slingshot by creating a new data source using the URL.
Slingshot supports OData, so once connected, you can build dashboards and visualizations using live
data from Microsoft Project.
For custom queries and filtered visualizations in Slingshot, append standard OData query parameters like
$select, $filter, $orderby, $top, and $skip to your requests.
Step 2: Connect Microsoft Project Endpoints in Slingshot to Analyze Data
Now that your OData API is ready, it's time to bring it into Slingshot and start analyzing your live Microsoft Project data.
2.1 Add the OData Endpoint as a Data Source
- Log in to your Slingshot account using the desktop app or by visiting
https://my.slingshotapp.io/.
- Navigate to My Analytics on the left panel. Click Data Source on top, then
click Data Source at the top-right.
π Slingshot App Dashboard
- Search for OData Feed and select it from the results.
π Select OData Feed
- In the URL field, enter the OData endpoint URL from your CData API Server. You can find it by navigating to
API > View Endpoints in the top-right corner of the CData API Server dashboard.
- Click on Credentials, then select the Credential
button from the drop-down.
π Add Credentials in Slingshot
- Enter your Username and either the Password or the Auth Token of
the user created in the CData API Server. Click Add, then click
Add Data Source to finish.
π Configure Authentication
- Click the connected OData Feed, select the desired table, and click Select Data to start analyzing.
π Select OData Table
2.2 Analyze Data
Now that your OData feed is connected and available in Slingshot, you can start creating visualizations
to explore and analyze your data in real-time.
For our example, let's build a simple Grid visualization.
-
Click on the Column drag-out panel, then select Grid.
π Selecting Grid View from Column Panel
-
Drag and drop the desired columns from your table into the Grid. Slingshot will automatically create
a live data view using those fields.
π Live Grid Visualization with Selected Columns
Similarly, you can create different visualizations like charts, tables, or pivot views by selecting the
appropriate components from the panel. Just drag, drop, and configure as needed to explore your data from multiple angles.
You can also play with your data further by applying filters, sorting values, or grouping rows as needed. The possibilities
are vast to tailor your dashboard exactly how you want it β powered by live Microsoft Project data,
connected data from your OData feed.
Try the CData API Server for 30 Days Free
The CData API Server offers the fastest way to build REST APIs from 270+ live data sources β with
a no/low-code, plug-and-play approach that's ready for real-time app integrations!
Start your free trial and connect instantly with tools like Slingshot. Simplify how your team accesses and interacts with data today.