Tableau is one of the leading BI platforms for connecting, visualizing, and sharing data insights.
With the CData API Server and the
Microsoft Project Connector (or any of the 270+ available),
you can quickly create APIs that expose live data from multiple sources, using industry standards
like OData and Swagger for seamless integration with Tableau.
In this article, we'll create a simple Tableau dashboard with live data from Microsoft Project, without moving or replicating data.
Let's get started!
Prerequisites
-
CData API Server: Download a
free trial here.
-
Tableau: Sign in, sign up, or download
from here.
-
An active Microsoft Project account with access to your data.
Overview
Here's a quick overview of the steps we'll follow:
-
Install the CData API Server, configure a connection to Microsoft Project, and use the OData endpoints.
-
Connect to these endpoints in Tableau to build live dashboards and reports.
Step 1: Install the API Server and Add a Connection to Microsoft Project
1.1 Install the API Server
If you haven't already, download an installer for your machine from the
CData API Server page.
Follow the installation instruction to complete the setup.
Once installed, you can start the server in the following ways:
-
Windows: CData API Server runs as a service by default. Make sure the service is running,
then open the http://hostname:port (e.g., http://localhost:8080/) in your browser to access
the API Server admin console.
-
Linux/Mac: You can run the server manually or as a service. To start it manually, navigate to
the installation directory and run java -jar apiserver.jar.
-
Alternatively, run service.sh with root privileges to set up API Server as a Linux system service.
1.2 Enable CORS
When Tableau and the CData API Server are hosted on different domains, CORS (Cross-Origin Resource Sharing) must be
enabled to allow Tableau to access the data endpoints. To enable CORS in the API Server:
- Go to Settings and click the icon to edit CORS settings.
- Enable Cross-Origin Resource Sharing (CORS).
- Enable Allow all domains without '*' to accept any origin.
- In Access-Control-Allow-Origin, enter your Tableau origin domain,
or use * to allow all domains (suitable for public APIs).
- Enable Access-Control-Allow-Credentials to allow cookies and auth headers.
- In Access-Control-Allow-Methods, enter GET, PUT, POST, OPTIONS.
- In Access-Control-Allow-Headers, enter Authorization, Content-Type.
- Set Access-Control-Max-Age (default: 3600 seconds) to cache preflight requests.
- Click Save.
π Enabling CORS Settings in the CData API Server
1.3 Add a Microsoft Project Connection in the API Server
-
Go to Settings and click
Add Connection in the top-right.
-
Select Microsoft Project. If it's not visible, toggle off
Only Installed to view all connectors.
-
Click Install Connector to auto-install.
For a manual setup, choose Manual Install and upload the downloaded ZIP file.
-
Once installed, click Microsoft Project again to open its connection settings and
configure using the details below.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user
credentials. In addition, specify a URL to a valid Microsoft Project server organization root or
Microsoft Project services file.
- Click Save & Test to validate and complete the connection setup.
π Adding a Connection in the CData API Server (Salesforce is Shown)
1.4 Add and Configure Users
To allow secure access to the created OData endpoints, create and configure Users in the CData API Server.
Each user has authentication credentials and role-based access control, ensuring that only authorized users
with appropriate roles can query the connected data.
-
Go to Users from the navigation pane, then click
Add User in the top-right corner.
- Enter a Username and set a secure Password for the user.
- Select a Role:
- Admin: Full access to all features, including settings and connections.
- Query: Limited to data access via API endpoints (suitable for Tableau use).
- (Optional) Configure rate limits:
- Requests Per Hour: Number of allowed API calls per hour (default: 1000).
- Max Concurrent Requests: Number of parallel API requests allowed (default: 10).
- Define Privileges for the user:
- GET: Allows data retrieval.
- POST: Allows creation of new records.
- PUT, MERGE, PATCH: Allows updates to existing records.
- DELETE: Allows deletion of records.
- Click Add User to save and activate the user account.
π Adding a User in the CData API Server
Once a user is added, an Authtoken is automatically generated. This token can be
used in API requests as a secure authentication method instead of a password.
You can also refresh the Authtoken, disable it, or set expiration rules (e.g., number of days until expiry)
by enabling the Token Expiration option in the user settings.
π 'Authtoken' Settings for the Added User in CData API Server
1.5 Add Tables for the Endpoint
To make data from Microsoft Project available in Tableau via OData, you need to expose your desired tables through the API Server. Here's how:
-
In the CData API Server, go to API from the left navigation, then click
Add Table at the top-right.
-
Select the Microsoft Project connection you configured earlier, then click Next.
-
Browse available entities and schema by expanding the Tables section.
Select individual tables, or click the TABLE NAME checkbox
at the top to select all. Then click Confirm.
π Adding Tables for API Endpoint in CData API Server
1.6 Access the Endpoints in Tableau
Now that your API is configured, you can connect Tableau directly to the OData endpoints to visualize live data.
Below are the URL formats for the OData endpoints:
| Endpoint |
|
URL |
| Entity List |
http://address:port/api.rsc/ |
| Table Metadata (e.g., albums) |
http://address:port/api.rsc/albums/$metadata?@json |
| Table Data (e.g., albums) |
http://address:port/api.rsc/albums |
These OData endpoints can now be connected to Tableau to create live dashboards, charts, and reports.
The CData API Server supports full OData filtering capabilities (OData ABNF). For refined queries,
you can append standard OData query parameters like
$select, $filter, $orderby, $top, and $skip to the requests.
Step 2: Create a Simple Dashboard in Tableau
With your CData API Server exposing OData endpoints for Microsoft Project data,
you can now connect Tableau to the API and build a real-time dashboard. Here's how to do it.
For this article, we'll use Tableau Desktop on Windows, but the steps should work with all Tableau versions.
2.1. Connect to the OData Endpoint
-
Get the CData API Endpoint URL by logging into your CData API Server. Go to API from the
left navigation, then click View Endpoints at the top-right.
- Copy the URL (e.g., http://localhost:8080/api.rsc).
π Getting the API Endpoint URL from CData API Server
- Launch Tableau and log in to your account.
-
On the left under To a Server, click More, then search for
OData and select it.
π Adding a Data Source in Tableau
- Add the following details:
- Server: Your CData API Server Endpoint URL (e.g., http://localhost:8080/api.rsc)
- Authentication: Select Username and Password.
- Username: Enter your CData Server API Username.
- Password: Enter your CData API Server Password.
π Connecting to OData API in Tableau
2.2. Create a Dashboard
- On the left under Tables, drag your desired table to the canvas, then click on
Sheet 1 at the bottom left.
π Dragging Tables to Canvas in Tableau
-
In Sheet 1, on the left under Tables, double-click your desired columns
from the selected table to add them to the view.
π Adding Columns to Visualization in Tableau
-
Drag and drop columns into the Columns and Rows sections at the top to create a
visualization. In this example, we have created a simple forecasting bar chart.
π Simple Forecasting Chart Example in Tableau
2.3. Refine Your Dashboard
Continue refining your dashboard by adding filters, formatting, and combining multiple sheets. You can create
more complex visualizations and interactive dashboards based on your live API data.
Try CData API Server Free for 30 Days
Build OData REST APIs with a low-code/no-code platform and unlock seamless integration with your live data.
Try CData API Server free for 30 days and experience how easily you can connect live Microsoft Project data
(or any of the 270+ available connectors) directly into Tableau for real-time dashboards and analytics.
Start your free trial here.