Connect to Microsoft Project from Asprova with CData ODBC Driver for Microsoft Project

πŸ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
This article shows how to connect faster to Microsoft Project data from Asprova.

The CData ODBC driver for Microsoft Project enables you to access Microsoft Project data from Asprova. In this article, you will import Microsoft Project data into item data in Asprova as an example.

Asprova setting

  1. Click File -> Data I/O Settings.

    πŸ‘ DataIO

  2. Double click the header of Item and open the Edit I/O dialog.

    πŸ‘ DataIO

  3. Select "No" from the RDB transaction combo box and close the dialog.

    πŸ‘ DataIO

Data driver setting

  1. Select "OLE DB" from combo box in "Data source" column.

    πŸ‘ DataIO

  2. Click button in Folder/database column and open the Data Link Property dialog. Select "Microsoft OLE DB Provider for ODBC Drivers" from the list of data provider.

  3. Select the Connection tab. Check "Use data source name" and select "CData Microsoft Project Source" from DSN combo box.

  4. Click the Test Connection button and make sure you see the message "Connection successful".

Schema setting

  1. Click the button in "External table name" column and open the Table List dialog. Make sure tables in Microsoft Project are listed in the dialog.

    πŸ‘ DataIO

  2. Click the button in "Field mapping" column and open the Item-Field Mapping dialog.

    πŸ‘ DataIO

  3. Open the context menu in the space between tables and click Delete All. Link corresponding fields by dragging mouse.

    πŸ‘ DataIO

  4. Click File > Import and data will be imported into Asprova.

Check data

Click Table View > Item. Be sure you can see the item data stored in Microsoft Project.

πŸ‘ DataIO

Ready to get started?

Download a free trial of the MS Project ODBC Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.