VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-odbc-power-bi-report-server.rst

⇱ View Reports on Real-Time Microsoft Project Data in Power BI Report Server


View Reports on Real-Time Microsoft Project Data in Power BI Report Server

πŸ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Use the CData ODBC Driver for Microsoft Project to visualize Microsoft Project data in Power BI Desktop and then publish them to Power BI Report Server.

With built-in support for ODBC on Microsoft Windows, CData ODBC Drivers provide self-service integration with self-service analytics tools, such as Microsoft Power BI. The CData ODBC Driver for Microsoft Project links your Power BI reports to operational Microsoft Project data. You can monitor Microsoft Project data through dashboards and ensure that your analysis reflects Microsoft Project data in real time by scheduling refreshes or refreshing on demand. This article details how to use the ODBC driver to create real-time visualizations of Microsoft Project data in Microsoft Power BI Desktop and then publish the visualizations to Power BI Report Server.

The CData ODBC Drivers offer unmatched performance for interacting with live Microsoft Project data in Power BI due to optimized data processing built into the driver. When you issue complex SQL queries from Power BI to Microsoft Project, the driver pushes supported SQL operations, such as filters and aggregations, directly to Microsoft Project and uses the embedded SQL Engine to process unsupported operations (often SQL functions and JOIN operations) client-side. With built-in dynamic metadata querying, you can visualize and analyze Microsoft Project data using native Power BI data types.

Connect to Microsoft Project as an ODBC Data Source

If you have not already, first specify connection properties in an ODBC data source name (DSN). This is the last step of the driver installation. You can use the Microsoft ODBC Data Source Administrator to create and configure ODBC DSNs. To publish Power BI reports from Power BI Desktop to Power BI Report Server, you will need to install the ODBC Driver on both the client (desktop) and server machines, using the same name for the DSN on each machine.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

When you configure the DSN, you may also want to set the Max Rows connection property. This will limit the number of rows returned, which is especially helpful for improving performance when designing reports and visualizations.

πŸ‘ Configuring a DSN (NetSuite is shown).

After creating a DSN, follow the steps below to connect to the Microsoft Project DSN from Power BI Desktop:

  1. Open Power BI Desktop and click Get Data -> ODBC. To start Power BI Desktop from PowerBI.com, click the download button and then click Power BI Desktop.
  2. Select a System DSN in the menu (necessary to publish to a Power BI Report Server). If you know the SQL query you want to use to import, expand the Advanced Options node and enter the query in the SQL Statement box. πŸ‘ Selecting a System DSN
  3. Select tables in the Navigator dialog. πŸ‘ The available tables. (NetSuite is shown.)
  4. Click Edit to edit the query. The table you imported is displayed in the Query Editor. In the Query Editor, you can enrich your local copy of Microsoft Project data with other data sources, pivot Microsoft Project columns, and more. Power BI detects each column's data type from the Microsoft Project metadata retrieved by the driver.

    Power BI records your modifications to the query in the Applied Steps section, adjusting the underlying data retrieval query that is executed to the remote Microsoft Project data. When you click Close and Apply, Power BI executes the data retrieval query.

    Otherwise, click Load to pull the data into Power BI.

Create Data Visualizations

After pulling the data into Power BI, you can create data visualizations in the Report view by dragging fields from the Fields pane onto the canvas. Follow the steps below to create a pie chart:

  1. Select the pie chart icon in the Visualizations pane.
  2. Select a dimension in the Fields pane, for example, ProjectName.
  3. Select a measure in the ProjectActualCost in the Fields pane, for example, ProjectActualCost. You can modify the visualization and the data used with the following techniques:
    • Change sort options by clicking the ellipsis (...) button for the chart. Options to select the sort column and change the sort order are displayed.
    • Use both highlighting and filtering to focus on data. Filtering removes unfocused data from visualizations; highlighting dims unfocused data. Highlight fields by clicking them.
    • Apply filters at the page level, at the report level, or to a single visualization by dragging fields onto the Filters pane. To filter on the field's value, select one of the values that are displayed in the Filters pane.
    πŸ‘ A pie chart showing Entity_Name and Total from the NetSuite SalesOrder table.
  4. Click Refresh to synchronize your report with any changes to the data and save your Power BI report to the client machine.

Upload Microsoft Project Data Reports to Power BI Report Server

You can share reports based on ODBC data sources with other Power BI users in your organization using a Power BI Report Server.

  1. Install and configure the ODBC Driver for Microsoft Project on the report server (see the instructions above).
  2. Log into the report server (typically found at http://MYSERVER/reports), click to upload a new report and select the report you just saved. πŸ‘ Uploading the Power BI Report to Power BI Report Server using the Web Portal.
  3. View the Microsoft Project report from any machine with access to the Report Server. πŸ‘ Viewing the published report from the Report Server.

Ready to get started?

Download a free trial of the MS Project ODBC Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.