VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-odbc-ssas-tabular.rst

⇱ Create SSAS Tabular Models from Microsoft Project Data


Create SSAS Tabular Models from Microsoft Project Data

πŸ‘ Dibyendu Datta
Dibyendu Datta
Lead Technology Evangelist
How to build a SQL Server Analysis Service Tabular Model from Microsoft Project data using CData drivers.

SQL Server Analysis Services (SSAS) is an analytical data engine used in decision support and business analytics. It provides enterprise-grade semantic data models for business reports and client applications, such as Power BI, Excel, Reporting Services reports, and other data visualization tools. When paired with the CData ODBC Driver for MS Project, you can create a tabular model from Microsoft Project data for deeper and faster data analysis.

Create a Connection to Microsoft Project Data

If you have not already, first specify connection properties in an ODBC DSN (data source name). This is the last step of the driver installation. You can use the Microsoft ODBC Data Source Administrator to create and configure ODBC DSNs.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

Creating a Data Source for Microsoft Project

Start by creating a new Analysis Services Tabular Project in Visual Studio. Ensure that you select a Compatibility Level of 1400 or higher in the Tabular model designer dialog. Next create a Data Source for Microsoft Project in the project.

  1. In the Tabular Model Explorer, right-click Data Sources and select "New Data Source"
  2. Select "ODBC" from the Other tab and click "Connect" πŸ‘ Selecting ODBC as the connector
  3. Select the DSN you previously configured πŸ‘ Selecting the DSN (Salesforce is shown)
  4. Choose "Default or Custom" as the authentication option and click "Connect" πŸ‘ Connecting to the DSN (Salesforce is shown)

Add Tables & Relationships

After creating the data source you are ready to import tables and define the relationships between the tables.

  1. Right-click the new data source, click "Import New Tables" and select the tables to import πŸ‘ Importing the tables (Salesforce is shown)
  2. After importing the tables, right-click "Relationships" and click "Create Relationships"
  3. Select table(s), and choose the foreign keys, cardinality, and filter direction πŸ‘ Configuring relationships between tables (Salesforce is shown)

Create Measures

After importing the tables and defining the relationships, you are ready to create measures.

  1. Select the column in the table for which you wish to create a measure
  2. In the Extensions menu -> click "Columns" -> "AutoSum" and select your aggregation method πŸ‘ Creating measures (Salesforce is shown)

Deploy the Model

Once you create measures, you are ready to deploy the model. Configure the target server and database by right-clicking the project found in the Solution Explorer and selecting "Properties." Configure the "Deployment Server" properties and click "OK."

πŸ‘ Configuring the deployment database

After configuring the deployment server, open the "Build" menu and click "Deploy Solution." You now have a tabular model for Microsoft Project data in your SSAS instance, ready to be analyzed, reported, and viewed. Get started with a free, 30-day trial of the CData ODBC Driver for MS Project.

Ready to get started?

Download a free trial of the MS Project ODBC Driver to get started:

 Download Now

Learn more:

πŸ‘ Microsoft Project Icon
MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.