How to create Visio diagrams from Microsoft Project Data

๐Ÿ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Automatically update Microsoft Project data with the changes you make to Visio master shapes.

Automate the process of entering data into Visio diagrams and keeping your diagrams up to date with the CData ODBC Driver for Microsoft Project. The driver surfaces Microsoft Project data as an ODBC data source that can be accessed by applications with built-in ODBC support like Microsoft Office. This article shows how to create a simple diagram to start brainstorming about Visio projects linked to Microsoft Project data.

Connect to Microsoft Project as an ODBC Data Source

If you have not already, first specify connection properties in an ODBC DSN (data source name). This is the last step of the driver installation. You can use the Microsoft ODBC Data Source Administrator to create and configure ODBC DSNs.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

Connect Microsoft Project Data to Diagrams

Follow the steps below to use the Data Selector Wizard to import data into your diagram.

  1. Open Visio and click File -> New. Open the Brainstorming template.
  2. On the Data tab, click Custom Import and select Other OLEDB or ODBC data source. ๐Ÿ‘ Selecting a data source
  3. Select the ODBC option and select ODBC DSN.
  4. Select the DSN for Microsoft Project, select the table you want to import, and finish the wizard. This article uses Projects as an example.
๐Ÿ‘ A table imported into a diagram based on the Brainstorming stencil. (Salesforce is shown.)

Link Microsoft Project Entities to Shapes

Follow the steps below to create a simple diagram that shows how to create shapes from your data, one of the ways to link Microsoft Project entities to shapes:

  1. Click Brainstorming Shapes and drag a main topic onto the drawing page. Enter Projects as the text of the main topic.
  2. Click Topic.
  3. Select a row in the External Data window and drag it onto the drawing page.
  4. Right-click the Topic shape and click Data -> Edit Data Graphic.
  5. Click New Item.
  6. In the Data Field menu, select a column. In the Displayed As menu, select how to display them. ๐Ÿ‘ A data graphic for a column.
  7. Drag a few other Microsoft Project entities onto the drawing page and add association lines back to the main topic, Projects. New topics have the same configuration: Numeric columns displayed in data bars stand out in contrast to other Projects entities. ๐Ÿ‘ Brainstorming with external data. (Salesforce is shown.)

You can refresh your diagram from the Data tab, synchronizing your shapes with the external Microsoft Project data.

Ready to get started?

Download a free trial of the MS Project ODBC Driver to get started:

 Download Now

Learn more:

๐Ÿ‘ Microsoft Project Icon
MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.