The CData Power BI Connector for MS Project seamlessly integrates with the tools and wizards in Power BI, including the real-time data workflows on PowerBI.com. Follow the steps below to pull data directly into DataFlows on PowerBI.com and use the Power BI Gateway to configure automatic refresh.
Installing the Power BI Connector creates a DSN (data source name) called CData Power BI Microsoft Project. This the name of the DSN that Power BI uses to request a connection to the data source. Configure the DSN by filling in the required connection properties.
You can use the Microsoft ODBC Data Source Administrator to create a new DSN or configure (and rename) an existing DSN: From the Start menu, enter "ODBC Data Sources." Ensure that you run the version of the ODBC Administrator that corresponds to the bitness of your Power BI Desktop installation (32-bit or 64-bit).
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
With the data source configured, follow the steps below to load data from Microsoft Project tables into your DataFlow.
Follow the steps below to configure the gateway on your machine:
In the Connectors step, choose a folder where the gateway will look for the CData Power BI Connector. This article uses C:\Users\PBIEgwService\Documents\Power BI Desktop\Custom Connectors\. Copy the .pqx files for the CData Connector (found in C:\Users\USERNAME\Documents\Power BI Desktop\Custom Connectors\) to the folder you configured.
NOTE: The account configured for the service (NT SERVICE\PBIEgwService) needs to be able to access the folder chosen for the gateway. If needed, you can change the service account in the Service Settings section of the gateway installer.
Refresh your dataflow to have the most up to date data.
๐ Scheduled refresh of Dataflow.
At this point, you will have a Dataflow built on top of live Microsoft Project data. Learn more about the CData Power BI Connectors for Microsoft Project and download a free trial from the CData Power BI Connector for MS Project page. Let our Support Team know if you have any questions.
Download a free trial of the MS Project Power BI Connector to get started:
Download NowLearn more: