![]() |
VOOZH | about |
In this article, we will guide you through the process of utilizing wizards within Visual Studio to seamlessly integrate the CData ADO.NET Provider for Microsoft Project into a basic MVC (Model, View, Controller) project.
Follow the steps below to save connection properties and map tables to entities in the data model.
If you are using Entity Framework 6, you will need to take the preliminary step of registering the Microsoft Project Entity Framework provider for your project. See the "LINQ and Entity Framework" chapter in the help documentation for a guide.
Note that MVC 3 scaffolding and MVC 4 scaffolding do not support Entity Framework 6. You can use your scaffolding with Entity Framework 6 by upgrading to the latest version of MVC.Specify the required connection string properties.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
A typical connection string is below:
User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;๐ The connection for the model. (QuickBooks is shown.)
Name the connection and select whether to include sensitive information, such as connection credentials, in the connection string. For simplicity, this example saves sensitive information in Web.config. The connection settings are saved as MicrosoftProjectEntities.
๐ The completed connection step in the ADO.NET Entity Data Model wizard. (A QuickBooks connection is shown.)Once you've established the model and completed the project build, you can employ ASP.NET Scaffolding wizards to generate both the controller and the views.
Download a free trial of the MS Project Data Provider to get started:
Download NowLearn more:
๐ Microsoft Project IconRapidly create and deploy powerful .NET applications that integrate with Microsoft Project data including Tasks, Issues, Projects, Deliverables, and more!