VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-odbc-dbeaver.rst

โ‡ฑ Connect to Microsoft Project Data in DBeaver


Connect to Microsoft Project Data in DBeaver

๐Ÿ‘ Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Use the CData ODBC Driver to connect to Microsoft Project data in DBeaver.

NOTE: The Legacy ODBC driver was removed in DBeaver Community Edition 23.1. As an alternative, you can use a CData JDBC Driver (learn how here: How to Connect DBeaver to Microsoft Project via JDBC). If you need to use ODBC Drivers, refer to the DBeaver Documentation.


The CData ODBC Driver for MS Project enables access to live data from Microsoft Project under the ODBC standard, allowing you work with Microsoft Project data in a wide variety of BI, reporting, and ETL tools and directly, using familiar SQL queries. This article shows how to manage Microsoft Project data with visual tools in DBeaver like the query browser.

The CData ODBC drivers offer unmatched performance for interacting with live Microsoft Project data in DBeaver due to optimized data processing built into the driver. When you issue complex SQL queries from DBeaver to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations (often SQL functions and JOIN operations) client-side. With built-in dynamic metadata querying, you can manage and analyze Microsoft Project data.

Connect to Microsoft Project

If you have not already done so, provide values for the required connection properties in the data source name (DSN). You can configure the DSN using the Microsoft ODBC Data Source Administrator. This is also the last step of the driver installation. See the "Getting Started" chapter in the Help documentation for a guide to using the Microsoft ODBC Data Source Administrator to create and configure a DSN.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

Finally, set the "Map To WVarchar connection property to False in the DSN Configuration window for the driver. This configuration will allow string types to be mapped to SQL_VARCHAR and prevent SQL_WVARCHAR types from being displayed as NULL.

๐Ÿ‘ Setting the Map To WVarchar property

Connecting to the Microsoft Project ODBC Data Source in DBeaver

  1. Open the DBeaver application and in the Database menu, select the New Database Connection option. ๐Ÿ‘ Creating a new Database Connection
  2. In the 'Connect to a database' window, select ODBC and click Next. ๐Ÿ‘ Creating a new Database Connection
  3. In the Database/Schema field, enter the DSN name (CData Microsoft Project Source by default). It will be automatically added to the JDBC URL as well.
  4. Click the Test Connection button. You should receive a 'Connected' message after DBeaver has detected the DSN, along with details about the driver if the connection is successful. ๐Ÿ‘ Successfully tested connection

Query Microsoft Project Data

You can now query information from the tables exposed by the data source connection. You can expand the database structure in order to view all the tables. You can retrieve the table's data by right-clicking on a table name and selecting View data. The data will then be available in the Data tab.

๐Ÿ‘ Viewing data (Salesforce is shown)

Free Trial & More Information

At this point, you have connected to live Microsoft Project data from DBeaver. For more information, visit the CData ODBC Driver page. Download a free, 30-day trial and start working live Microsoft Project data DBeaver today.

Ready to get started?

Download a free trial of the MS Project ODBC Driver to get started:

 Download Now

Learn more:

๐Ÿ‘ Microsoft Project Icon
MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.