VOOZH about

URL: https://www.cdata.com/kb/tech/msproject-odbc-r.rst

⇱ Analyze Microsoft Project Data in R via ODBC


Analyze Microsoft Project Data in R via ODBC

👁 Jerod Johnson
Jerod Johnson
Director, Technology Evangelism
Create data visualizations and use high-performance statistical functions to analyze Microsoft Project data in Microsoft R Open.

Access Microsoft Project data with pure R script and standard SQL. You can use the CData ODBC Driver for Microsoft Project and the RODBC package to work with remote Microsoft Project data in R. By using the CData Driver, you are leveraging a driver written for industry-proven standards to access your data in the popular, open-source R language. This article shows how to use the driver to execute SQL queries to Microsoft Project data and visualize Microsoft Project data in R.

Install R

You can complement the driver's performance gains from multi-threading and managed code by running the multithreaded Microsoft R Open or by running R linked with the BLAS/LAPACK libraries. This article uses Microsoft R Open (MRO).

Connect to Microsoft Project as an ODBC Data Source

Information for connecting to Microsoft Project follows, along with different instructions for configuring a DSN in Windows and Linux environments.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

When you configure the DSN, you may also want to set the Max Rows connection property. This will limit the number of rows returned, which is especially helpful for improving performance when designing reports and visualizations.

Windows

If you have not already, first specify connection properties in an ODBC DSN (data source name). This is the last step of the driver installation. You can use the Microsoft ODBC Data Source Administrator to create and configure ODBC DSNs.

Linux

If you are installing the CData ODBC Driver for Microsoft Project in a Linux environment, the driver installation predefines a system DSN. You can modify the DSN by editing the system data sources file (/etc/odbc.ini) and defining the required connection properties.

/etc/odbc.ini

[CData MicrosoftProject Source]
Driver = CData ODBC Driver for Microsoft Project
Description = My Description
User = myuseraccount
Password = mypassword
URL = http://myserver/myOrgRoot

For specific information on using these configuration files, please refer to the help documentation (installed and found online).

Load the RODBC Package

To use the driver, download the RODBC package. In RStudio, click Tools -> Install Packages and enter RODBC in the Packages box.

After installing the RODBC package, the following line loads the package:

library(RODBC)

Note: This article uses RODBC version 1.3-12. Using Microsoft R Open, you can test with the same version, using the checkpoint capabilities of Microsoft's MRAN repository. The checkpoint command enables you to install packages from a snapshot of the CRAN repository, hosted on the MRAN repository. The snapshot taken Jan. 1, 2016 contains version 1.3-12.

library(checkpoint)
checkpoint("2016-01-01")

Connect to Microsoft Project Data as an ODBC Data Source

You can connect to a DSN in R with the following line:

conn <- odbcConnect("CData MicrosoftProject Source")

Schema Discovery

The driver models Microsoft Project APIs as relational tables, views, and stored procedures. Use the following line to retrieve the list of tables:

sqlTables(conn)

Execute SQL Queries

Use the sqlQuery function to execute any SQL query supported by the Microsoft Project API.

projects <- sqlQuery(conn, "SELECT ProjectName, ProjectActualCost FROM Projects", believeNRows=FALSE, rows_at_time=1)

You can view the results in a data viewer window with the following command:

View(projects)

Plot Microsoft Project Data

You can now analyze Microsoft Project data with any of the data visualization packages available in the CRAN repository. You can create simple bar plots with the built-in bar plot function:

par(las=2,ps=10,mar=c(5,15,4,2))
barplot(projects$ProjectActualCost, main="Microsoft Project Projects", names.arg = projects$ProjectName, horiz=TRUE)
👁 A basic bar plot. (Salesforce is shown.)

Ready to get started?

Download a free trial of the MS Project ODBC Driver to get started:

 Download Now

Learn more:

👁 Microsoft Project Icon
MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.