VOOZH about

URL: https://www.geeksforgeeks.org/java/period-between-method-in-java-with-examples/

⇱ Period between() method in Java with Examples - GeeksforGeeks


  • Courses
  • Tutorials
  • Interview Prep

Period between() method in Java with Examples

Last Updated : 27 Nov, 2018
The between() method of Period class in Java is used to obtain a period consisting of the number of years, months, and days between two given dates (including start date and excluding end date). This period is obtained as follows:
  • Remove complete months.
  • Now, calculate the remaining number of days.
  • Then, adjust to ensure that both have the same sign.
  • Now, split the number of months into years and months based on a 12 month year.
  • Consider a month, if the end day-of-month is greater than or equal to the start day-of-month (Eg.: from 2017-05-12 to 2018-07-18 is one year, two months and six days).
Note: Period obtained from above formula can be a negative, if the end is before the start. The negative sign will be the same in each of year, month and day. Syntax:
public static Period between(LocalDate startDateInclusive,
 LocalDate endDateExclusive)
Parameters:
  • startDateInclusive - The start date is inclusive and must not be null.
  • endDateExclusive - The end date is exclusive and must not be null.
Return Value: The between() function of period returns the period between the given start and end date. Below is the implementation of above function:
Output:
Period between start and end date is : P1Y6M7D
Reference: https://docs.oracle.com/javase/8/docs/api/java/time/Period.html#between-java.time.LocalDate-java.time.LocalDate-
Comment