![]() |
VOOZH | about |
Content |
OJSC Sakhalinenergo provides centralized power supply to 18 of the 23 municipalities of the Sakhalin Region, as well as heat supply to Yuzhno-Sakhalinsk and Vostok. OJSC Sakhalinenergo combines 5 structural divisions with the number of working personnel of about 3.5 thousand people.
At the end of 2025, revenue under IFRS of the Sakhalinenergo Group reached 17.97 billion rubles. The indicator increased by 16.7% compared to the data for 2024, when revenue was 15.4 billion rubles. The company's net profit amounted to 5.42 billion rubles against a loss of 9.56 billion rubles in 2024. This is evidenced by the company's reporting data released in April 2026.[1])
In early June 2024, the first deputy general director of the company, chief engineer Pavel Yakovlev, was appointed the new head of Sakhalinenergo. Read more here.
A resident of Yuzhno-Sakhalinsk created a mining farm and damaged the Sakhalinenergo enterprise in the amount of 22 million rubles, illegally connecting to the power grids. This was reported in the press service of the Russian MIA Administration for the Sakhalin Region on September 1, 2023. Read more here.
| 👁 Шестерня | The site content is translated by machine translation software powered by PROMT. The machine-translated articles are not always perfect and may contain errors in vocabulary, syntax or grammar. Read original article If you find inaccuracies or errors in the results of machine translation, please write to editor@tadviser.ru. We will make every effort to correct them as soon as possible. |